My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 11:36:29 AM
Creation date
6/3/2020 9:56:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CNI Manufacturi stallation, Operation and Maintenan anual (IOM) <br />Applicable to Executive Order VR -104-D <br />Summary of Guidelines for Maintenance Activities Required 2 <br />Component <br />Interval <br />Maintenance to Perform <br />Drain Valve <br />Monthly <br />Anti -seize compound must be applied to <br />CNI Mfg. RP12-PUSH <br />the shaft at least once a month to prevent <br />shaft from sticking. <br />NOTE: Reference the exploded view of <br />the drain valve in the <br />maintenance/installation instructions in <br />this manual for points that require <br />anti -seize compound be applied each <br />time the drain valve is removed. <br />Every 18 months <br />1. Unscrew the drain valve. <br />2. Unscrew the cap. <br />and <br />3. Remove screw and washer. <br />4. Pull the shaft. <br />5. Clean and check the screen, <br />If the drain valve <br />replace if it's damaged. <br />fails ARB drop tube <br />6. The O-ring needs to be replaced <br />tests TP201.1 C, or <br />each time the drain valve is <br />TP201.1 D, or if <br />disassembled. <br />valve causes failure <br />7. The plunger gasket needs to be_ <br />of ARB pressure <br />replaced each time the drain is <br />decay test TP201.3 <br />disassembled. <br />a new gasket kit <br />8. Clean all parts before <br />(DVK1) must be <br />reassembling, and ensure that <br />installed. <br />anti -seize compound is applied to <br />the components noted in exploded <br />drawing in this manual. <br />9. To assemble, reverse the <br />procedure. <br />10. Screw in the drain valve until <br />bottomed out and then an <br />additional 360 degree turn. <br />11. Screw the cap back on until finger <br />tight. <br />NOTE: CNI Mfg. gasket kit DVK1 <br />includes a plunger gasket P/N RP12-9 <br />and O-ring P/N RP12-7. <br />2 These maintenance requirements shall not circumvent use of the manufacturer's maintenance instruction. <br />Maintenance contractors or owner/operators shall refer to the complete Installation and Maintenance Instructions <br />found within this document for each manufacturer's component. Ensure that all maintenance and torque <br />requirements are met. Maintenance must be conducted within the interval specified from the date of installation <br />and at least within the specified interval thereafter. <br />15627 ARROW HIGHWAY, IRWINDALE, CALIFORNIA 91706 <br />PHONE (626) 962-6646; OUT OF STATE CALLS (800) 4CNI-MFG; FAx (626) 962-4854 <br />WEBSITE: WWW.CNI-MFG.com EMAIL: INFo(a)CNI-MFG.COM <br />
The URL can be used to link to this page
Your browser does not support the video tag.