Laserfiche WebLink
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: 0—15 PSI GAUGES Equipment Resolution: +/-0.002" <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> WASTE OIL RODUCT WATSE OIL VENT <br /> Piping Material: FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: AMERON AMERON <br /> Piping Diameter: 2"/3" 2"/3" <br /> Length of Piping Run: 65' 75' <br /> Product Stored: WASTE OIL WASTE OIL <br /> Method and location of TEST BOOT/STP TEST BOOT/STP <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 MIN 10 MIN <br /> starting test: <br /> Test Start Time: 10:00 AM 10:AM <br /> Initial Reading(RI): 5.0 PSI 5.0 PSI <br /> Test End Time: 11:00 AM 11:00 AM <br /> Final Reading(RF): 0.0 PSI 5.0 PSI <br /> Test Duration: 1 HR 1 HR <br /> Change in Reading(RF-RI): -5.0 PSI 0 PSI <br /> Pass/Fail Threshold or NO LOSS NO LOSS <br /> Criteria: <br /> Test Result: ❑Pass ®Fail Z Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WASTE OIL PRODUCT SECONDARY TEST BOOT WAS INSTALLED TIGHT WHEN ARRIVED ON SITE <br /> LOOSEN TEST BOOT TO INSTALL TEST PORT AND AROUND 2.50 GALLONS OF WATER FLOWED OUT OF SECONDARY <br /> LINE WILL NOT HOLD ANY PRESSURE <br /> WASTE OIL TANK VENT SECONDARY LINE WAS MISSING TEST BOOT, INSTALLED BLUE LINE SR 3.5 X 2.4AIR <br />