My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 11:36:29 AM
Creation date
6/3/2020 9:56:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: 0—15 PSI GAUGES Equipment Resolution: +/-0.002" <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> WASTE OIL RODUCT WATSE OIL VENT <br /> Piping Material: FIBERGLASS FIBERGLASS <br /> Piping Manufacturer: AMERON AMERON <br /> Piping Diameter: 2"/3" 2"/3" <br /> Length of Piping Run: 65' 75' <br /> Product Stored: WASTE OIL WASTE OIL <br /> Method and location of TEST BOOT/STP TEST BOOT/STP <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 MIN 10 MIN <br /> starting test: <br /> Test Start Time: 10:00 AM 10:AM <br /> Initial Reading(RI): 5.0 PSI 5.0 PSI <br /> Test End Time: 11:00 AM 11:00 AM <br /> Final Reading(RF): 0.0 PSI 5.0 PSI <br /> Test Duration: 1 HR 1 HR <br /> Change in Reading(RF-RI): -5.0 PSI 0 PSI <br /> Pass/Fail Threshold or NO LOSS NO LOSS <br /> Criteria: <br /> Test Result: ❑Pass ®Fail Z Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WASTE OIL PRODUCT SECONDARY TEST BOOT WAS INSTALLED TIGHT WHEN ARRIVED ON SITE <br /> LOOSEN TEST BOOT TO INSTALL TEST PORT AND AROUND 2.50 GALLONS OF WATER FLOWED OUT OF SECONDARY <br /> LINE WILL NOT HOLD ANY PRESSURE <br /> WASTE OIL TANK VENT SECONDARY LINE WAS MISSING TEST BOOT, INSTALLED BLUE LINE SR 3.5 X 2.4AIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.