Laserfiche WebLink
6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer N Industry Standard ❑ Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ❑ Pressure ❑Vacuum N Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: INCON SUMP TESTER Equipment Resolution: +1-0.002" <br /> Sump#87 Sump#91 Sump#DIESEL Sump#WASTE OIL <br /> Sump Diameter: 48" 48" 48" 48" <br /> Sump Depth: 74" 72.50" 80" 75" <br /> Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS <br /> Height from Tank Top to Top of 23.50" 28" 22.50" 33" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 36" 36" 41" 26" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: DRY DRY DRY DRY <br /> Portion of Sump Tested' ABOVE ABOVE ABOVE ABOVE <br /> PENETRATION PENETRATION PENETRATION PENETRATION <br /> Does turbine shut down when <br /> sump sensor detects liquid(both N Yes [—]No ❑NA N Yes [:]No ❑NA N Yes [—]No ❑NA ❑Yes ❑No N NA <br /> product and water)?* <br /> Turbine shutdown response time 3 SEC 3 SEC 3 SEC N/A <br /> Is system programmed for fail-safe N Yes ❑No ❑NA N Yes [--]No ❑NA N Yes ❑No ❑NA ❑Yes ❑No N NA <br /> shutdown?* <br /> Was fail-safe verified to be <br /> operational?* ®Yes [__1No [INA N Yes [--]No ❑NA N Yes [INo F-1NA El Yes ❑No N NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 MIN 10 MIN 10 MIN 10 MIN <br /> test: <br /> Test Start Time: 9:26 AM 11:19 AM <br /> Initial Reading(Rj): 7.5157' 6.9008" <br /> Test End Time: 9:41 AM 11:34 AM <br /> Final Reading(RF): 7.5158" 6.9006" <br /> Test Duration: 15 MIN 15 MIN <br /> Change in Reading(RF-Ri): 0.0001" -0.0002" <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" <br /> Test Result: N Pass ❑Fail ❑Pass ❑ Fail ❑Pass ❑ Fail N Pass ❑Fail <br /> Was sensor removed for testing? N Yes ❑No [:INA ❑Yes [:]No N NA ❑Yes ❑No N NA N Yes [:]No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? ®Yes [:]No ❑NA [-]Yes ❑No N NA ❑Yes ❑No N NA N Yes [:]No <br /> ❑NA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ABOVE IS THE LAST OF TWO BACK TO BACK 15 MINUTE TESTS <br /> 91 AND DIESEL STP SUMP NOT TESTED DUE TO SECONDARY LINES REPAIRS NEED TO BE MADE <br /> 1 If the entire depth of the sump is not tested,specify how much was tested. If the answer to aM of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />