My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2009-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 11:36:29 AM
Creation date
6/3/2020 9:56:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2010
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231995_1403 W COUNTRY CLUB_2009-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer N Industry Standard ❑ Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ❑ Pressure ❑Vacuum N Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: INCON SUMP TESTER Equipment Resolution: +1-0.002" <br /> Sump#87 Sump#91 Sump#DIESEL Sump#WASTE OIL <br /> Sump Diameter: 48" 48" 48" 48" <br /> Sump Depth: 74" 72.50" 80" 75" <br /> Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS <br /> Height from Tank Top to Top of 23.50" 28" 22.50" 33" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 36" 36" 41" 26" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: DRY DRY DRY DRY <br /> Portion of Sump Tested' ABOVE ABOVE ABOVE ABOVE <br /> PENETRATION PENETRATION PENETRATION PENETRATION <br /> Does turbine shut down when <br /> sump sensor detects liquid(both N Yes [—]No ❑NA N Yes [:]No ❑NA N Yes [—]No ❑NA ❑Yes ❑No N NA <br /> product and water)?* <br /> Turbine shutdown response time 3 SEC 3 SEC 3 SEC N/A <br /> Is system programmed for fail-safe N Yes ❑No ❑NA N Yes [--]No ❑NA N Yes ❑No ❑NA ❑Yes ❑No N NA <br /> shutdown?* <br /> Was fail-safe verified to be <br /> operational?* ®Yes [__1No [INA N Yes [--]No ❑NA N Yes [INo F-1NA El Yes ❑No N NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 MIN 10 MIN 10 MIN 10 MIN <br /> test: <br /> Test Start Time: 9:26 AM 11:19 AM <br /> Initial Reading(Rj): 7.5157' 6.9008" <br /> Test End Time: 9:41 AM 11:34 AM <br /> Final Reading(RF): 7.5158" 6.9006" <br /> Test Duration: 15 MIN 15 MIN <br /> Change in Reading(RF-Ri): 0.0001" -0.0002" <br /> Pass/Fail Threshold or Criteria: +/-0.002" +/-0.002" <br /> Test Result: N Pass ❑Fail ❑Pass ❑ Fail ❑Pass ❑ Fail N Pass ❑Fail <br /> Was sensor removed for testing? N Yes ❑No [:INA ❑Yes [:]No N NA ❑Yes ❑No N NA N Yes [:]No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? ®Yes [:]No ❑NA [-]Yes ❑No N NA ❑Yes ❑No N NA N Yes [:]No <br /> ❑NA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ABOVE IS THE LAST OF TWO BACK TO BACK 15 MINUTE TESTS <br /> 91 AND DIESEL STP SUMP NOT TESTED DUE TO SECONDARY LINES REPAIRS NEED TO BE MADE <br /> 1 If the entire depth of the sump is not tested,specify how much was tested. If the answer to aM of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.