Laserfiche WebLink
C <br />SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />.7 <br />Page 5 of I <br />Test Method Developed By: <br />X Sump Manufacturer <br />X Industry Standard Professional Engineer <br />Other (Specify) <br />Test Method Used: <br />Pressure <br />Vacuum <br />X Hydrostatic <br />Other (Specify) <br />Test Equipment Used: Incon <br />Equipment Resolution: <br />Sump #) 87 p,,� � <br />Sump #a g? ° � ` <br />Sump #3 q/ � E <br />Sump # Tp_fr 5 ` � <br />rSumpmeter: <br />�� <br />t� <br />pth: <br />o� <br />a 8 Y2 <br />�s <br />Sump Material: <br />FlmLv, ,(sus <br />i-,� d <br />r <br />F <br />Height from Tank Top to Top of <br />1 <br />Highest Piping Penetration: <br />a (� <br />1 <br />1 <br />) 7 <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Portion of Sump Tested' <br />— ��� <br />E q�-t eg <br />n/4-tC c <br />E,d b e - d <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />Yes No n <br />Yes No <br />Yes No <br />Yes No <br />product and water)?` <br />Turbine shutdown response time <br />---- <br />----- <br />Is system programmed for fail-safe <br />Yes No <br />Yes No A <br />Yes No <br />Yes No <br />shutdown?* <br />Was fail-safe verified to be <br />operational?* <br />Yes No <br />Yes No A <br />Yes No <br />Yes No <br />Wait time between applying <br />pressure/vacuum/water and starting <br />if IM / tt <br />test: <br />Test Start Time: <br />q ; �O ,¢ji7 <br />/D ; ,4-n78: <br />S � A '* <br />%; <br />Initial Reading (Rj):5• <br />7°I ! <br />3 D <br />f • 9 qa <br />Test End Time: <br />; c f p qy! <br />/0; 5 2 pkn <br />9;0 7 <br />; d <br />Final Reading (RF): <br />516. 7 7 <br />. &? & 35- <br />74, 5f <br />Test Duration: <br />IS" M i n/ . <br />/ 5 "1 oir/ <br />S M /'n/ <br />Change in Reading (RF-&): <br />- vO/S <br />- ', 00O <br />—,001? <br />; Ooo I <br />Pass/Fail Threshold or Criteria: <br />+/-.002 <br />+/-.002 <br />+/-.002 <br />+/-.002 <br />Tesi 11;esuTt: <br />as Pail. <br />m9z Eai <br />as EaiL <br />ass Pail <br />Was sensor removed for testing? <br />No NA <br />(ZR) No NA <br />(!!�o NA <br />No NA <br />Was sensor properly replaced and <br />es No NA <br />No NA <br />es No NA <br />Ces No NA <br />verified functional after testing? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />