Laserfiche WebLink
Test Method Used: Pressure Vacuum X Hydrostatic <br />Other (Specify) <br />Test Equipment Used: Incon <br />Sump #5 0 Sump # <br />Sump Diameter. i/ <br />Equipment Resolution: <br />Sump # Sump # <br />Sump Depth: q,5 Y2, <br />Sump Material: F, 6 /* 5!5 <br />5 <br />Height from Tank Top to Top of <br />Highest Piping Penetration: -35- <br />Height from Tank Top to Lowest <br />Height <br />Electrical Penetration: 3 <br />Condition of sump prior to testing: <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both Yes No <br />product and water)?* <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />Turbine shutdown response time <br />Is system programmed for fail-safe Yes No ® <br />shutdown?' <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />Was fail-safe verified to be Yes No <br />operational?* <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />Wait time between applying <br />pressure/vacuum/water and starting 5 Yn IA/ <br />test: <br />Test Start Time: <br />Initial Reading (Rj): q. I I p c� <br />Test End Time: g ' 3G *M <br />Final Reading (RF): cf , g d <br />Test Duration: 15 M/4/. <br />Change in Reading (RF-Rj): -� . F96, 3 <br />Pass/Fail Threshold or Criteria: +/-.002 <br />+/-.002 <br />+/-.002 <br />+/-.002 <br />H <br />Al 'des I esul " was Tta ., <br />x 7 <br />has , , Fair <br />Pass:. <br />d for testing? No NA <br />Was sensor removed <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />Was sensor properly replaced and es No NA <br />verified functional. after testing? <br />Yes No NA <br />Yes No NA <br />Yes No NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />