My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1989-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MICHAEL CANLIS
>
7000
>
2300 - Underground Storage Tank Program
>
PR0504967
>
COMPLIANCE INFO_1989-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 1:40:41 PM
Creation date
6/3/2020 9:58:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989-2013
RECORD_ID
PR0504967
PE
2361
FACILITY_ID
FA0006440
FACILITY_NAME
SHERIFFS OPERATIONS CTR #2
STREET_NUMBER
7000
Direction
N
STREET_NAME
MICHAEL CANLIS
STREET_TYPE
BLVD
City
FRENCH CAMP
Zip
95231
APN
19305014
CURRENT_STATUS
01
SITE_LOCATION
7000 N MICHAEL CANLIS BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0504967_7000 N MICHAEL CANLIS_1989-2013.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T.A.B-JONN;NG SYSTEM AND FITTINGS--Thisexclu- <br />sive T.A.B <br />xcu'miveT-AB <br />stalled. It is the standard joining system for UL Listed <br />RED THREAD H pipe. Spigot and bonded -on couple ends <br />are threaded with special profile double -lead threads. Com- <br />bined with adhesive at time of assembly, T.A.B. Joint <br />promotes positive makeup and prevents backout during <br />cure, T.A.B. Joint is fast and easy to use. <br />Compatible fittings also listed by Underwriters' <br />Laboratories for underground handling `" petroleump°= <br />ucts. See back page for fittings configurations. <br />HANDLING AND STORAGE RED THREAD Upipe he <br />packaged in compact bundles of four to eight lengths. <br />/- Bundles of ''E= THREAD 11 pipe can be safely stored on <br />\ <br />level ground or on racks with 10 -foot (or less) support <br />spacing. Reasonable care must beused inhandling RED <br />THREAD ffpipe. Dmnot drop orthrow RED THREAD I[ <br />pipe on the gnound, or drop stones or other heavy ob- <br />jects onit. <br />CUTTINGM--RED THREAD 11 pipe is eascut with anily <br />ordinary hacksaw, using fine-toothed blade. For ease <br />u*tapering, the cut end should basquare oopossible. <br />TAPERINGn` -- When RED THREAD pipe is cut to <br />length onthe job site, the cut end must beretopered.The <br />field tapering tool pictured below is used for this purpose. Adaptable to two-, three-, and four -inch pipe, thetool quickly applies the proper taper by a shaving operation — similar to a pencil sharpener. Plain unthreadedfield-made tapers can be joined with factory installedthreaded TA.B. Joint coupled ends. Either factorymade T.A.B. spigots or field -made tapers maybe joined with belled fittings. For proper tapering, carefully follow the operating instructionsInc uded with the tapering tool kit.FIELD TAPERING TOOL <br />OJOINING PROCEDUREM _ <br />1 Clean spigot and coupled ends <br />using the joint cleaner included <br />in adhesive kit. After a surface is <br />cleaned, do not touch or other- <br />wise contaminate it with dirt. <br />2.Apply thoroughly mixedadhe- <br />sive boboth surfaces. <br />3. Insert the spigot into the <br />coupled end using aturning mo- <br />tion ... joint must lock. <br />ADHESIVES -- The adhesive <br />kits requiredhu in handling <br />petroleum products are A. O. <br />Smith -inland D8-8314'2`. DS - <br />8324c2), DS -8369(70. These kits have <br />S'E024c2).DS'83G0m0.Theoekhohmve <br />m 85 minute working life at 750F. <br />However, curing time ofthe ad' <br />nesw on an assembled joint m <br />dependent mnthe ambient temperature. Heat assist methods <br />uoshorten cure times are recommended for ambient tempera- <br />tures be|mm 70"F. A. O. Smith -inland has developed two <br />methods nfsupplying the necessary heat hobond pipe joints. <br />For porUcu|oox, refer to the A. O. Smith -inland Installation <br />Instructions. <br />All adhesive kits contain epoxy resin and hardener in <br />separate oonhsinera, joint o/eoner, mixing stirk, paint <br />brush and paper bom/e|e. A detailed instruction sheet is <br />included. Following these instructions will insure easy, <br />fast assembly of RED THREAD 11 pipe. <br />mFor additional information on cutting. tapering and joining procedures refer <br />( mA.0Smith-Inland mstailatmInstructions. <br />4 w ou'mw. m*7024end DS -7069 which were formerly used are being <br />phased out. <br />wNot recommended mvmvmo''.o^uou*^ mmu/mmonv because of large <br />quantity madhesive per kit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.