Laserfiche WebLink
SWRCB,January 2002 Page of <br /> SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution:0-15 PSI <br /> ' Piping Run#5 Piping Run# Piping Run# Piping Run# <br /> Piping Material: Fiberglass <br /> Piping Man Smith <br /> Piping Diameter: 3" <br /> Length of Piping Run: 20' <br /> Product Stored: Diesel <br /> Method and location of Test boot Test boot Test boot Test boot <br /> pipmg-run.isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test.- <br /> Test <br /> est:Test Start Time: 10:20 <br /> Initial Reading 5 PSI <br /> Test End Time: 11:20 <br /> Final Reading(RF): 5 PSI <br /> Test `on: I Hour 1 Hour I Hour I <br /> Hour <br /> Change in Reading 0 <br /> Pass/Fail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> TestResult: z Pass ❑Fall ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />