My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 6. PIPING SUW TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Sped) <br /> Test Method Used: ❑Pressure D Vacuum X Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 <br /> Sump#1 Sump# Sump# Sump# <br /> Sump Diameter: 42" <br /> Sump Depth: 5399 <br /> Sump al: Fiberglass <br /> Height from Tank Top to Top of 181 <br /> Highest Etm&Penetration:. <br /> Height from Tank Top to Lowest i299 <br /> Electrical Penetration: <br /> Condition of sump prior to g: Dry <br /> Portion of Sump Tested' 2"above Highest piping penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both x Yes ❑No ❑NA D Yes O No ❑NA D Yes O No ❑NA ❑Yes D No D NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe x Yes ❑No ❑NA ❑Yes ❑No O NA ❑Yes O No O NA ❑Yes O No O NA <br /> shutdown?* <br /> Was fail-safe verified to be O Yes x No D NA ❑Yes ❑No D NA DYesONo DNA O Yes O No DNA <br /> o tion ?` <br /> Wait time between applying <br /> pressure/vacuumtwater and starting 5 min 5 min 5 min 5 <br /> min <br /> test: <br /> Test S Time: 11:45 <br /> Initial R (R'). 99 .0091 " .00" <br /> Test End Time: 12:15 (VIIV/ <br /> Final Reading(RF): .00 <br /> TestDuration: 30 min 30 min 30 min 30 min <br /> Change in Reading Ri): .00 <br /> Pass/Fail Threshold or Criteria: .005/30 min °005/30 5/30 min .005/30 <br /> min <br /> Test Result: x ❑Fall ❑ Pm ❑Fail ❑ ❑Fail ❑ Pass ❑Fail. <br /> Was sensor removed for testing? x Yes D No ❑NA x Yes ❑No ❑NA x Yes O No ❑NA ❑Yes D No O NA <br /> Was sensor properly replaced and x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No DNA O Yes ❑No ❑NA <br /> verified functional ? <br /> Comments—(include information on re irs made prior to testing, and reco ended follow-up for failed tests) <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with <br /> an <br /> asterisk($)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.