My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:52:42 PM
Creation date
6/3/2020 9:59:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
517
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB January 2002 Pate 3 of i <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard ❑Professional Engineer <br /> X Other(Spec) Incon <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Incon TS-STS Sump Test System Equipment Resolution: 0.002 <br /> UDC# 1/2 UDC#3/4 UDC#5/6 UDC#7/8 <br /> UDC7Depth: <br /> Bravo Bravo Bravo Bravo <br /> UDC Steel Steel Steel Steel <br /> UDC 12" 12" 12" 12" <br /> Height from UDC Bottom to Top 1" 1" 1" 1" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dirty Dirty Dirty Dirty <br /> testing: <br /> Portion of UDC Tested' 1/3 1/3 1/3 1/3 <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail- ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA <br /> safe shutdown?* <br /> Was fail-safe verified to be ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA <br /> operational?* <br /> Wait time between applying 5 min 5 min 5 min 5 min <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: 3:20 3:20 3:20 3:45 <br /> Initial Reading(RI): 0.1600 0.2045 0.9919 0.5017 <br /> Test End Time: 3:35 3:35 3:35 4:01 <br /> Final Reading(RF): 0.1598 0.2037 0.9915 0.4999 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading(RF-RI): 0.0002 0.0008 0.0004 0.0018 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Was sensor removed for testing. ❑ Yes ❑No X NA ❑ Yes ❑No X NA ❑ Yes ❑No X NA ❑ Yes ❑No X NA <br /> Was sensor properly replaced and ❑ Yes ❑No X NA ❑ Yes ❑No X NA ❑ Yes ❑No X NA ❑ Yes ❑No X NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> MAR <br /> ENVIRONMENITAi <br /> 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to pgy of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRC13 LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.