Laserfiche WebLink
SWRCB,January 2002 Page i 0 of <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC)TESTING <br /> Test Method Developed By: 0 UDC Manufacturer ❑Industry Standard 0 Professional Engineer <br /> X Other(Spec) Incon <br /> Test Method Used: D Pressure ❑Vacuum X Hydrostatic <br /> Other(Specify) <br /> oTestipment Used: Incon TS-STS Sump Test System Equipment Resolution: 0.002 <br /> UDC# 12113A UDC# 13/14A UDC# 14/15A UDC#15/16 <br /> anufacBravoBravo Bravo Bravo <br /> aterialSteelSteel Steel Steel <br /> e 12" 12" 12" 12" <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to F, <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dirty Dirty Dirty Dirty <br /> testing: <br /> Portion of UDC Tested' 1/3 1/3 1/3 1/3 <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail- ❑Yes D No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA D Yes D No X NA <br /> safe shutdown?* <br /> Was fail-safe verified to be 0 Yes 0 No X NA ❑Yes ❑No X NA ❑Yes ❑No X NA 0 Yes ❑No X NA <br /> operational?* <br /> Wait time between applying 5 min 5 min 5 min 5 min <br /> pressure/vacuum/water and <br /> starting test <br /> Test Start Time: 1:05 1:05 1:36 1:36 <br /> Initial Reading(RI): 0.7383 0.4090 0.0605 0.2122 <br /> Test End Time: 1:20 1:20 1:51 1:51 <br /> Final Reading(RF): 0.7376 0.4091 0.0599 0.2114 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Chane in Reading(RF-RI): 0.0007 0.0001 0.0006 0.0008 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> pr NSF� r <br /> Tes ReSUIt �4 1£a iy. Passi11 III II 4'Pa$5IIA,e <br /> "'Ex's 9Ya�ltlty -lJ r. .I <br /> Was sensor removed for testing? ❑ Yes 0 No X NA 0 Yes []No X NA 0 Yes 0 No X NA ❑ Yes ❑No X NA <br /> Was sensor properly replaced and ❑ Yes ❑No X NA ❑ Yes 0 No X NA 0 Yes 0 No X NA 0 Yes 0 No X NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> MAR <br /> Vi <br /> 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to Any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />