Laserfiche WebLink
Page 5 of 9 <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer I] Industry Standard ❑ Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑ Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> UDC # 1/2 UDC # 3/4 UDC # 5/6 UDC # 7/8 <br /> UDC Manufacturer: U.K U.K U.K U.K <br /> UDC Material: FG FG FG FG <br /> UDC Depth: 30" 30" 30" 30" <br /> Height from UDC Bottom to Top of 12" 12" 12" 12" <br /> Highest Piping Penetration: <br /> Height from UDC Bottom to Lowest 4" 4" 4" 4" <br /> Electrical Penetration: <br /> Condition of UDC prior to testing: D Dry Dry Dry <br /> Portion of UDC Tested' 16" 16" 16" 16" <br /> Does turbine shut down when UDC <br /> sensor detects liquid(both product ❑ Yes ❑ No © NA ❑ Yes ❑ No ® NA ❑ Yes ❑ No IRI NA ❑Yes ❑ No IRI NA <br /> and water)?* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail-safe ❑ Yes ❑ No IRI NA ❑ Yes ❑ No ® NA ❑Yes ❑ No ® NA ❑Yes ❑ No ® NA <br /> shutdown?` <br /> Was fail-safe verified to be ❑ Yes ❑ No ® NA ❑ Yes ❑ No ® NA ❑Yes ❑ No IF] NA ❑Yes ❑ No IF] NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 0 0 0 0 <br /> test <br /> Test Start Time: 4:30 pm 4:30 pm 4:30 pm 4:30 pm <br /> Initial Reading Ri): 15" 15 1/2- 15 1/2" 15 1/4" <br /> Test End Time: 5:30 pm 5:30 pm 5:30 pm 5:30 pm <br /> Final Reading(RF): 15" 15 1/2" 15 1/2" 15 1/4" <br /> Test Duration: lhr lhr lhr lhr <br /> Change in Reading RF-Ri : 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 0 0 <br /> Test Result: O Pass ❑ Fail' 0 Pass ❑ Fail RI Pass ❑ Fail L7 Pass ❑ Fail <br /> Was sensor removed for testing? ® Yes ❑No ❑ NA ® Yes ❑ No ❑ NA ®Yes ❑ No ❑ NA ®Yes ❑ No ❑ NA <br /> Was sensor properly replaced after ® Yes ❑ No ❑ NA ®Yes ❑ No ❑ NA ®Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA <br /> testing? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />