My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1330
>
2300 - Underground Storage Tank Program
>
PR0515864
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 10:44:40 AM
Creation date
6/3/2020 10:00:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0515864
PE
2361
FACILITY_ID
FA0012355
FACILITY_NAME
A&A GAS FOOD MART
STREET_NUMBER
1330
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120053
CURRENT_STATUS
01
SITE_LOCATION
1330 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0515864_1330 E YOSEMITE_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v v <br /> Elite IV Contractors <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run#87 Piping Run#91 Piping Run#Die Piping Run# <br /> Piping Material: Fiber Fiber Fiber <br /> Piping Manufacturer: AO Smith Smith Smith <br /> Piping Diameter: 2" 2" 2" <br /> Length of Piping Run: 130' 130' 140' <br /> Product Stored: 87 91 Die <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Min 15 Min 15 Min <br /> starting test: <br /> Test Start Time: 1,100 1,100 1,100 <br /> Initial Reading(Rj): 4 PSI 4 PSI 4 PSI <br /> Test End Time: 1,200 1,200 1,200 <br /> Final Reading(RF): 4 PSI 4 PSI 4 PSI <br /> Test Duration: 1 HR 1 HR 1 HR <br /> Change in Reading(RF-Rj): 0 0 0 <br /> Pass/Fail Threshold or 1/16 PSI 1/16 PSI 1/16 PSI <br /> Criteria: <br /> Test Result: X Pass El Fail X Pass ❑Fail;, X Pass ❑Fail ❑ Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ,.y <br /> 7T v s � <br /> , T' <br />
The URL can be used to link to this page
Your browser does not support the video tag.