My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2231-2238 – Tiered Permitting Program
>
PR0506982
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 11:16:58 AM
Creation date
6/5/2020 2:18:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0506982
PE
2231
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ser or ry Contuament A sessrnent Page A: <br />Overhead Tv iew: <br />Cry sectionall (Weral) view, <br />Vohune calculatiow;.- <br />Tank volume (largest tank.): 7,400 gallons, <br />Ccsutainment volume (sum of areas 1, 2 & 3) = 14,363 gallons (gross) <br />Less tar& volume = 376 gallons, containment volume = 13,937 gallons (net) <br />Volurnelinch -13987 gal/24 in - 582.8 gal/in <br />Excess volume ; 13987 - 7400 gals. equivalent to 6587 gal / 582.8 gal/in = 11.3 in <br />24 hr., 25 yr. storm = 2.4 to 2.6" for most of San Joaquin Valley_ <br />Therefore, secondary containment vottanc is adequate. <br />Design of containment area: Secondary containment is provided by a number of area.-, enclosed by poured <br />concrete, or concrete block walls with m -bar, The containment area does not have cracks or gaps to aliow the <br />escape of spilled Menial. Arca 1 (last end) is connected to area 2 by an open 6 in. pipe, and area 2 is <br />connected to area 3 Gest end) by a 6 in- pipe. Thee pipes will accommodate flow of 300 to 500 gpm <br />depending upon the head. Area 1 is equippod with a level indicator for leak detection, which will sound an <br />alarm whea. liquid is detected. Liquid is recycled using an AODD pump. <br />Areas 1, 2 & 3 are: coated with epox}= which is re-applied annually. <br />Secondary Containment Leak Testas - The pre -neutralizer area (Areas 1, 2 & 3), and the final neutralizer area, <br />are Mod with water (area 3 partially filled, area 1- removpe pumps before filling), and visually checked for <br />leaks. Upon completion, the ver is treated ut the systemlmW discharged to the sewer_ Testing will be initiated <br />this year or early next and rested every five years. Appropriate records will be maintained. <br />Site Security: The entire site is tcawcod. The gate is locked when company personnel are not present. <br />Semredaay Ooatainmest fmdings: The scconda,ry containinent system is of sufficient capacity and condition <br />for the coRta MocW of nelcases from the 7.400 gallon wastewater tank and ancillary equipment. <br />Initials: k,✓ <br />Califorma Tank Lines, I=. Wastewater Processing 'Tanks (3 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.