Laserfiche WebLink
Final Remedial Plan E-3 September 1992 <br /> 3788 Tracy Boulevard Rev. : D1 <br />' Tracy, California P1745R005.WP <br /> soil will be excavated and hauled for disposal at a proper landfill <br />' facility. <br />' Work is anticipated to commence in mid-October and will <br /> require approximately 45 days for completion. This estimate <br />' includes delays for verification analyses of excavated surfaces. <br /> Work will be done between the hours of 7 : 30 a.m. and 5: 00 p.m. <br />' Noise and dust created should be minimal. Traffic impact will be <br /> limited to equipment entering and leaving the site. <br />' Following removal and disposal of contaminated soil, <br /> groundwater will be monitored for a period of one year. At that <br /> time, data will be evaluated with regard to closure of the <br /> remediation program at this site. <br /> I <br /> f <br />