Laserfiche WebLink
16 <br /> 3. MEASUREMENT AND PAYMENT <br /> 3.1.1 GENERAL <br /> Direct payment will be made only for the items listed in the proposal. Items of work not listed, but <br /> necessary to satisfactorily complete the Work,will not be paid for separately; and all costs in <br /> connection therewith shall be considered to be included for payment with the listed items. <br /> 3.1.2 ITEM NO. 1: MOBILIZATION <br /> A. Measurement:—Mobilization for test hole drilling and well construction, satisfactorily <br /> completed, will be paid for at the applicable lump sum price stated in the proposal. <br /> B. Payment: —Mobilization will be made at the unit prices stated in the proposal. Such payment <br /> will be considered full compensation for mobilizing all labor, material, tools and equipment <br /> necessary and incidental to drill the test holes and construct the wells. <br /> 3.1.3 ITEM NO. 2:TEST HOLE DRILLING <br /> A. Measurement: —Test hole drilling will be measured as the number of lineal feet for which drill <br /> cuttings and a geophysical log are acquired. <br /> B. Payment:—Payment for test hole drilling will be made on a linear foot basis at the unit price <br /> stated in the proposal. Such payment will be considered full compensation for furnishing all labor, <br /> material, tools and equipment necessary and incidental to complete the test hole. <br /> 3.1.4 ITEM NO. 3: GEOPHYSICAL LOGGING <br /> A. Measurement and Payment: -- Payment for this item shall be considered full compensation <br /> for all labor, tools, equipment, insurance and doing all work necessary and incidental to running a <br /> geophysical log in the test holes, including standby time. If the Engineer requests additional <br /> logging runs, in writing, the Contractor shall be paid for the additional logging"at-cost plus 15 <br /> percent'. <br /> 3.1.5 ITEM NO.4: BOREHOLE REAMING <br /> A. Measurement: —Borehole reaming will be measured as the number of lineal feet successfully <br /> completed for construction of well. <br /> B. Payment: --Payment for borehole reaming will be made on a linear foot basis at the unit price <br /> stated in the proposal. Such payment will be considered full compensation for furnishing all labor, <br /> material, tools and equipment necessary and incidental to complete the test hole reaming. <br /> 3.1.6 ITEM NOS. 5 and 6:WELL CASING AND SCREEN <br /> A. Measurement: —Well casing and screens shall be measured in place to the nearest whole <br /> unit of lineal feet satisfactorily installed in the final well. <br />