Laserfiche WebLink
' 26 October 2000 <br /> AGE-NC Project No. 98-0466 <br /> ' Page 3 of 10 <br /> ' This report concerns the investigation of the western ditch area and the septic leach field areas. <br /> ' 1.2.1. West Ditch <br /> AGE does not have a copy of the original Phase I report and bases the following discussion on <br /> ' inferences from various reports issued by Kleinfelder, Inc. (Kleinfelder) and from the PSI report <br /> executive summary. <br /> ' Kleinfelder,in American Moulding and Millwork Phase IIIAssessmentR eport,dated 06 May 1992, <br /> reported the oil and grease were detected in surface soil,but not at 5 feet below surface grade(bsg) <br /> in the drainage ditch. Soil was being removed from the ditch at the timc of the Kleinfelder report. <br /> PSI reported that metals and chlorinated hydrocarbons had been detected in soil in the west ditch <br /> area. <br /> The oil and grease,chlorinated hydrocarbons and metals were the potential contaminants of concern <br /> in the ditch soil. Additionally, the former dipping tanks that utilized the wood preservatives <br /> pentachlorophenol and trichlorophenol are located nearby, creating an additional compound of <br /> ' potential concern. <br /> ' 1.2.2. Leach Fields <br /> Kleinfelder's 15 June 1987 Work Plan-Phase Illnvestigation for the subject site proposed a boring <br /> to test soil for pentachlorophenol/trichlorophenol(PCP/TCP),total petroleum hydrocarbons(TPH), <br /> formaldehyde, lead, zinc and chromium in the septic tank leach field no heast of the Finger Joint <br /> ' Building.AGE infers that the leach field described is the leach field curre fitly in use northeast of the <br /> warehouse,which is also northeast of the Finger Joint building(approximately 550 feet away),but <br /> much closer to the former(approximately 50 feet away). <br /> ' A second septic leach field lies west of the Millwork building, approximately 1,400 north of the <br /> septic leach field described above. This leach field does not appear to be referred to in the <br /> Kleinfelder documents. According to Mr. Glen Gallup, potential contaminants in the Millworks <br /> leach field would include formaldehyde, lead, zinc and chromium. <br /> 1.3. SCOPE OF WORK <br /> ' AGE, in Phase II Site Assessment Work Plan -Septic Leach Fields and Drainage Ditch, dated 02 <br /> June 2000,proposed to advance one soil boring to 35 feet bsg in each of the leach field areas and one <br /> near the western ditch area for the collect soil and grab ground water samples. Additionally, AGE <br /> Advanced GeoEnvironmental,Inc. <br />