My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
15999
>
2300 - Underground Storage Tank Program
>
PR0231945
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 12:54:47 PM
Creation date
6/18/2020 1:46:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231945
PE
2361
FACILITY_ID
FA0003934
FACILITY_NAME
Lawrence Livermore National Lab - Site 300
STREET_NUMBER
15999
Direction
W
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
15999 W CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 FINAL DRAFT Page 3 of 4 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ❑Pressure ®Vacuum ❑ Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Test FAuipment Used: 0 to 30"hg Dial Gaye 2%a Mid Scale <br /> DIESEL Piping Run# Piping Run# Piping Run# <br /> FOS/FOR <br /> Piping Material: FRP <br /> Piping Manufacturer: Ameron <br /> Piping Diameter: 4" <br /> Length of Piping Run: 12' <br /> Product Stored: Diesel <br /> Method and location of Boot @ Sump. <br /> piping-run isolation: <br /> Wait time between applying <br /> pressureA,acuum/water and NA <br /> starting test: <br /> Test Start Time: NA <br /> Initial Reading(R): NA <br /> Test End Time: NA <br /> Final Reading(RF): NA <br /> Test Duration: NA <br /> Change in Reading(RF-R): NA <br /> Pass/Fail Threshold or 0.00"hg <br /> Criteria: <br /> Test Result ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass [—]Fail <br /> Comments—(Include information on repairs made prior to testing, and recommended follow-up for failed tests.) <br /> 4"Ameron FRP piping over common Steel FOR and FOS piping. <br /> Test boot in sump was pulled back after testing was complete. <br /> "Containment pipe could not be tested as the boot at day tank end is tom. Customer has requested a quote for repairs and follow <br /> up testing. <br /> Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.