Laserfiche WebLink
BUCKEYE RANCH - PROJECT DESCRIPTION PAGE 5 <br /> gates would be installed at the point at which Forest Lake Road reaches <br /> the subject property. <br /> In addition, the property is served by an entrance off of a private right- <br /> of-way from the extension of Jahant Road. it is not contemplated that <br /> this existing access point would serve the intended development other than <br /> as an access point for the stables and the eastern portion of the property <br /> which will be left in a natural state. <br /> The 2.5 miles of paved roads within the project will be privately owned <br /> and maintained by the Homeowners' Association. Some cul-de-sacs with <br /> adequate turnarounds for fire equipment will be necessary. <br /> Bridaes <br /> The project will require construction of four on-site bridges crossing the <br /> lake at different points and one bridge crossing the Mokelumne River. it <br /> is anticipated that all of the bridges will be free spans, supported on <br /> driven pilings or drilled columns and will require minimum amounts of fill <br /> for approaches. We are currently looking at utilizing 85 and 90 foot <br /> railroad flatcars specially modified to meet HS-20 highway ratings. <br /> Conceptual designs are in process for: <br /> 1. Typical cross sections of roads. <br /> 2. Typical lake crossing. <br /> 3. Approaches and bridge. <br /> 4. Typical culvert crossing. <br /> 5. Typical entry gates. <br /> 6. Plan for abandonment of Forest Lake Road. <br /> 7. Easements (if necessary) over private lots. <br /> Pedestrian <br /> A joint equestrian/pedestrian trail system will meander around the <br /> perimeter of the property. Due to the low levels of traffic, the private <br /> roads will be used to provide pedestrian access between the homes. The <br /> holes of the golf course will be connected by a pedestrian trail system. <br /> GOLF COURSE <br /> The firm of Weiskopf and Morrish has prepared a design for the 18-hole <br /> golf course. The design calls for a "links" style course laid out to take <br /> maximum advantage of and preserve the natural topographic and aesthetic <br /> values of the site. The "links" style course incorporates the natural non- <br /> irrigated groundcover into much of the fairway. This construction method <br /> greatly reduces watering requirements and creates a very interesting and <br /> challenging course. <br />