My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013451
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAKE FOREST
>
2248
>
2600 - Land Use Program
>
WC-90-1
>
SU0013451
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 4:00:53 PM
Creation date
6/23/2020 11:17:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013451
PE
2600
FACILITY_NAME
WC-90-1
STREET_NUMBER
2248
Direction
W
STREET_NAME
LAKE FOREST
STREET_TYPE
RD
City
ACAMPO
APN
00306001
ENTERED_DATE
6/17/2020 12:00:00 AM
SITE_LOCATION
2248 W LAKE FOREST RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1834
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUCKEYE RANCH - PROJECT DESCRIPTION PAGE 5 <br /> gates would be installed at the point at which Forest Lake Road reaches <br /> the subject property. <br /> In addition, the property is served by an entrance off of a private right- <br /> of-way from the extension of Jahant Road. it is not contemplated that <br /> this existing access point would serve the intended development other than <br /> as an access point for the stables and the eastern portion of the property <br /> which will be left in a natural state. <br /> The 2.5 miles of paved roads within the project will be privately owned <br /> and maintained by the Homeowners' Association. Some cul-de-sacs with <br /> adequate turnarounds for fire equipment will be necessary. <br /> Bridaes <br /> The project will require construction of four on-site bridges crossing the <br /> lake at different points and one bridge crossing the Mokelumne River. it <br /> is anticipated that all of the bridges will be free spans, supported on <br /> driven pilings or drilled columns and will require minimum amounts of fill <br /> for approaches. We are currently looking at utilizing 85 and 90 foot <br /> railroad flatcars specially modified to meet HS-20 highway ratings. <br /> Conceptual designs are in process for: <br /> 1. Typical cross sections of roads. <br /> 2. Typical lake crossing. <br /> 3. Approaches and bridge. <br /> 4. Typical culvert crossing. <br /> 5. Typical entry gates. <br /> 6. Plan for abandonment of Forest Lake Road. <br /> 7. Easements (if necessary) over private lots. <br /> Pedestrian <br /> A joint equestrian/pedestrian trail system will meander around the <br /> perimeter of the property. Due to the low levels of traffic, the private <br /> roads will be used to provide pedestrian access between the homes. The <br /> holes of the golf course will be connected by a pedestrian trail system. <br /> GOLF COURSE <br /> The firm of Weiskopf and Morrish has prepared a design for the 18-hole <br /> golf course. The design calls for a "links" style course laid out to take <br /> maximum advantage of and preserve the natural topographic and aesthetic <br /> values of the site. The "links" style course incorporates the natural non- <br /> irrigated groundcover into much of the fairway. This construction method <br /> greatly reduces watering requirements and creates a very interesting and <br /> challenging course. <br />
The URL can be used to link to this page
Your browser does not support the video tag.