My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013451
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAKE FOREST
>
2248
>
2600 - Land Use Program
>
WC-90-1
>
SU0013451
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 4:00:53 PM
Creation date
6/23/2020 11:17:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013451
PE
2600
FACILITY_NAME
WC-90-1
STREET_NUMBER
2248
Direction
W
STREET_NAME
LAKE FOREST
STREET_TYPE
RD
City
ACAMPO
APN
00306001
ENTERED_DATE
6/17/2020 12:00:00 AM
SITE_LOCATION
2248 W LAKE FOREST RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1834
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
which is dedicated to land conservation. The conservation easement is central to the <br /> development of Buckeye Ranch, its management philosophy and the Resource Plan. <br /> Environmentally sensitive management is an active process and therefore the Resource Plan <br /> is a working document. The Plan contains mechanisms to insure periodic updating. On a <br /> regular basis information gained from pilot projects and management activities will be <br /> incorporated into the plan. Relevant information from the fields of ecology, IPM and <br /> resource management will also be reviewed and incorporated into the Management Plan. <br /> The result will be adaptive restoration and management, an ongoing process of refinement. <br /> The objectives of the project are to develop homes and recreational facilities on Buckeye <br /> 1 Ranch while preserving and enhancing natural wildlife and habitat values. Therefore <br /> human impacts both during the construction phase and over the long term management of <br /> the property will be minimized. Environmental conditions, construction activities, <br /> restoration projects and land and habitat management activities will be carefully monitored <br /> under the direction of the group which receives the conservation easement to insure <br /> compliance with the overall preservation objectives. <br /> 1.2 An overview of the Resource Plan Document <br /> The introduction, Section 1, states the project's guiding philosophy, objectives and a brief <br /> description of the development plans for Buckeye Ranch. In Section 2, the natural features <br /> and processes of the site are characterized as well as recent human use, management and <br /> fire history. In Section 3 the development plans are described more fully based on six use <br /> categories, or zones, along with the management,restoration and preservation planned for <br /> each zone. Management and restoration plans are set out more fully in the next two <br /> sections. Section 4 addresses the impact of the proposed development on the natural <br /> resources of the Ranch, and the conservation of special status species is discussed in <br /> Buckeye Ranch Resource Plan (November, 1993) <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.