Laserfiche WebLink
i <br /> 2.0 PERSONNEL RESPONSIBILITIES <br /> Personnel responsible for implementing this health and safety plan(HASP) are <br /> • Client Liaison Dan Lapporte <br /> • Project Manager Jackie Shulters <br /> • Site Health and Safety Officer <br /> and Project Geologist/Engineer Jason Gray <br /> The following is a schematic displaying the chain of command with respect to <br /> health and safety issues <br /> Project Manager <br /> Site Health and Safety Officer and <br /> Project Geologist/Engineer <br /> Other Field Personnel <br /> and Subcontractors <br /> 2.1 Res onsibilities of the Project Manage <br /> The Project Manager has ultimate responsibility to ensure that the HASP is <br /> implemented and that the project is executed in accordance with all applicable federal, state, and <br /> local requirements as well as Radian's corporate policy <br /> The responsibilities of the Project Manager are <br /> Ensure that field personnel, including subcontractors, are participating in <br /> the necessary medical monitoring and are properly trained in safety, <br /> health, and emergency procedures, and <br /> . • Interface with Chevron Pipe Line Company and Mr Robert Roberts <br /> (Roberts Property owner) if issues anse which require alteration to or <br /> deviations from the HASP <br /> 2-1 <br /> 1 <br />