My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
COMPLIANCE INFO_2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2024 4:04:53 PM
Creation date
6/23/2020 6:39:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0535432_2680 REYNOLDS RANCH_2013-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ma r. 27. 2013 8:33AM No, 6553 P. 5 <br /> F. in-Tank Gauging/SIR Equipment: a Check this box It tank gauging is used only for inventory control. <br /> Check this box it no tank gauging or SIR equipment is Installed. <br /> This section must be completed If In-tank gauging equipment Is used to perform leak detection monitoring. <br /> Gcm tete the followinma ehecldist: <br /> Yes JU6# as <br /> all Input wiring been inspected for proper entry and termlaation,including testing for ground faults? <br /> Yes Not all tank gauging probes visually Inspected for damage and residue buildup? <br /> Yes accuracy of system product level readings tested? <br /> Yes aoouracy of system water level readings lasted? <br /> Yes ail probes reinstalled property?Yes 811 hems on the equipment manufacturers maintenance checklist completed? <br /> In the Section H,below,describe how and when these deflclencles were or wlil be corrected. <br /> G. Line Leak Detectors(LLD): ❑Check[his box If LLDs are not installed. <br /> Com lete the followirra chscidlst: <br /> it Yes No' For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> N/A that apply) Slmulated leak rate:03 6.p-h,;[]0.1 g.p.h;❑0.2 g.p.h. <br /> if Yes No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> x Yes Ne Was the testing apparatus properly calibrated? <br /> Yes No" For mechanical LLDs,does the LLD restrict product how if It detects a leak? <br /> N/A <br /> x Yes No" For electronic LLDs,does the turbine automatically shut oft if the LLD detects a leak? <br /> N/A <br /> x Yes No" For electronic LLDs, does the turbine automatically shut off it any portion of the monitoring system is disabled or <br /> N/A disconnected? <br /> x Yes No" For electronic LLDs,does the turbine automatically shut off if arty portion of the morrhodng system malfunctions or <br /> N/A fails a Reel? <br /> x Yes NW For electronic LLDs,have all accessible wiring connections bean visually Inspected? <br /> N/A• <br /> x Yes No' Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or wile be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page of 12107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.