Laserfiche WebLink
0 Is RECEIVED <br /> SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING FEB 2 02015 <br /> Test Method Developed By: X Piping Manufacturer Industry Standard LEI Pr <br /> E!Other(Spec) NWffftENTAe <br /> Test Method Used: X Pressure I Vacuum Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 4" 3" 3'° <br /> Length of Piping Run: Approx. 10' Approx.20' Approx.6' <br /> Product Stored: Diesel/Bulk Rack Diesel Regular 87 <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation: Piping Sump#1 Piping Sump#1 Piping Sump#2 <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> Test Start Time: 12:40 12:50 12:55 <br /> Initial Reading(Rj): 3 Psi 3 Psi 3 Psi <br /> Test End Time: 1:40 1:50 1:55 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour I Hour <br /> Change in Reading(RF-Ri): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: I Pass I Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />