My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_1995-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 3:13:14 PM
Creation date
6/23/2020 6:40:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2006
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231072_2705 COUNTRY CLUB_1995-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH%EPARTMENT <br />SAN JOAQUIN COUNTY <br />oPc <br />?� Donna K. Heran, R.E.H.S. <br />Director 304 East Weber Avenue, Third Floor <br />Al Olsen, R.E.H.S. Stockton, California 95202-2708 <br />cq.. i`P • Program Manager Telephone: (209) 468-3420 <br />R Laurie A. Cotulla, R.E.H.S. <br />Program Manager Fax: (209) 464-0138 <br />December 22, 2003 <br />USA Gasoline Corp. <br />30101 Suite 200 <br />Agoura Hills CA 91310 <br />Unit Supervisors <br />Carl Borgman, R.E.H.S. <br />Mike Huggins, R.E.H.S., R.D.I. <br />Douglas W. Wilson, R.E.H.S. <br />Margaret Lagorio, R.E.H.S. <br />Robert McClellon, R.E.H.S. <br />Mark Barcellos, R.E.H.S. <br />RE: Addendum to Permit Application # SR0035992. [ 2705 Country Club Blvd ] <br />The permit addendum to as listed on your "Additional Scope of Work" document has <br />been approved under the following conditions. <br />1. A conformation tank test must be conducted on the tank prior to the final <br />inspection. <br />2. All sumps and spill buckets will need to have a lake test or equivalent prior to <br />being put into operation. Schedule an appointment to be inspected. <br />3. Primary and secondary line that have been exposed will need to be pressure <br />tested, re- checked for slope, and soap tested prior to backfilling. Arrange an <br />Inspection. <br />4. Ensure this system meets one of the accepted overfill prevention options as listed <br />in Title 23 Division 3, Chapter 16, Sections 2635&2636. <br />5. Arrange an inspection to verify overfill prevention. <br />6. Arrange all inspections 48 hours in advance. <br />If you have any questions call me at (209) 468-3440. <br />Thank <br />John Jackson REHS <br />Registered Environmental Health Specialist. <br />
The URL can be used to link to this page
Your browser does not support the video tag.