My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Traditional Repair Instructions <br /> For Environ `°10 Stud GDB Series" Repair Kit <br /> This kit provides the Traditional Repair parts,using a URBK Repair Boot,for existing FlPELex - <br /> Pipe from 1.8"to 3.6"OD inside 4"Corrugated Ducting for applications where the pipe is <br /> coming thru the sump wall straight. <br /> IJRBKZ ENY G®B 10-XX WARNING:Prepare all surfaces to be bonded prior to completing installation steps below. i <br /> For traditional Environ Failure to follow each step will void warranty&may result In premature fallure of penetration fitting. <br /> repairs with Large pipe in CDS This 10 al2olles for re a rin :Environ GOB 70GO Series Pa <br /> Page 1 with ainine from 1.8"to 3.6"OD <br /> Rev 2 6-242009 <br /> General Instructions for: CLEANING:Spray all surfaces to be bonded with DBC Cleaner and allow to air dry or wipe excess with a clean dry <br /> cloth. Surfaces must be dry before applying bonder. i <br /> General Instructions for: BONDING TO POLY SUMPS OR FIBERGLASS SUMPS: Clean,sand and rough up sump surfaces. Clean fitting and <br /> apply DBB V between Bonding Ring&sump wall. <br /> STEP 1: Loosen Nuts& ull Back Metal Rin STEP 2: Clean all Repair Components STEP 3: Place Repair Boat&CDI <br /> Clean all repair components with DBC <br /> • • Place the split Repair Boot over the pipe with the <br /> Remove Nuts P g <br /> • Pull back metal mounting flange&discard prior to installation sealing grooves toward the sump wall j <br /> • Cut off old boot&discard • Place the CDi over the pipe i <br /> Traditional Corrugated <br /> • Cut away old Green CDI&discard Repair Boot Duct insert <br /> • Cut away old insert&discard <br /> • Clean off any'pasW or other bonders — <br /> i <br /> from around the Environ body&sump -` = <br /> wall, - <br /> • Clean&sand sump wall 7 - - <br /> • Spray Environ Body&sanded sump wall <br /> with DBC Cleaner Cleaner <br /> J. <br /> i <br /> i <br /> STEP 4: Bond Repair Boot& CDI STEPS: Install CDI <br /> • Apply Zip-Tite to the split Repair Boot. Use 2 of the Slide CDI Into place&seal any openings with j <br /> clamps,#132&96,to hold in place while curing. DRP Repair paste.Use one of the existing <br /> • Apply Zip-Tite to the CDL Use 1 of the clamps,#72, clamps to clamp in place. <br /> to hold in place while curing. <br /> • Leave these clamps in place for approx 30 minutes <br /> for curing before proceeding to the next step <br /> i <br /> Fill part an top •::• -;- - <br /> i <br /> i <br /> i <br /> i <br /> i <br /> i <br /> i <br /> Diversified Products Manufacturing Inc.Environ Repair Manual Full Version Rev 3 Page 33 of 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.