My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
URBKZ Environ FEB 4 Stud "Rigid Conduit" Repair Kit <br /> For Existing Conduit pipe from 112"to 1.5"OD in Direct Burial Application repairs <br /> Page 2 <br /> STEP 6: Install The Repair Boot <br /> Seal around the existing boot &pipe If needed. <br /> • Apply a thick bead of DBB V all around the sealing surface of the - <br /> repair boot <br /> • Slide the repair boot over the studs with the fill port at top <br /> • Install the Flange Nut <br /> • Do Not over tighten.-Snug is ok <br /> • Set the Clamp over the pipe end of the repair boot. . <br /> TradiflotWtRepalr�omponoYSfor Perpip#igrlatTiigngenirie5 qn Dlrg3 @octal Caadpit appTCtt�rtsratlth:£iust€ngEnviron ' <br /> =-t-.'.FEB DE ewes: ration fittin s ` <br /> Sac tdgnal:4:_srorviFit IUI Pipe OD DB F18 <br /> 111ns`t aEt -- Inches Reealr Kit Product Number Clamp Size oz. <br /> FEB-3150 for 1 DW GeoRex-D Pie 1A5 URBKZ 4-1.5 24 2 <br /> FEB-3100 for 1"Rigid Conduit 1.315 URBKZ4-41 20 2 <br /> FEB-3075 for 3L4"GeoFlex D Pie 1.18 URBKZ 4-1.2 20 3 <br /> FEB-3075 for 3/4"Rigid Conduit LOS URBKZ 4-1.1 16 3 <br /> FEB-3075 for 04'1 RI d Condult Vertical RD 1.05 URBKZ 4-1.1 VF 16 1 j <br /> Not available In Traditional Repair <br /> FEB 3050for 112"Rigid Conduit 0.84 Kit.See Multi- c <br /> Step 10: Fill With DBF 11,insert Fill Plug TOOLS REQUIRED: ' <br /> • Assemble DAG&DBF If(see instructions on DPM website). <br /> Gloves and Static Mixer i <br /> • Purge i-2 oz. 7/16"Nut driver (for flange nuts) <br /> • Fill fitting slowly. _-- - 5/16"Nut driver (for Band Clamps) <br /> Note: Use Remote Fill option if access is limited - - DAG Caulk Gun (for DBF II) <br /> • Insert fill plug when filling is completed. DAGP Caulk Gun (Pneumatic version for DBF II) <br /> • Clean any spilled DBF it with DBC and dispose DAG!il Caulk Gun (for DBB V) <br /> of remaining products per local requirements, — <br /> PRODUCTS NEEDED: <br /> DBC Cleaner Each DBF 11&DBB V come <br /> Note:After 1 hour with a Static Mixer <br /> the repair job may be = Zip rite Bonder <br /> hydro-static tested DBF 11 Polysulfide Liquid Fill <br /> DBB V Bonder(for Poly or Fiberglass sumps) <br /> FILL Volume• foer repair boott <br /> Volume of DBF II needed = See above Chart <br /> Remote Fill Option: Volume of Zip-Tate needed = 1/2 Oz <br /> Volume of DBB V needed = 13 ML <br /> The following parts are available to order if you can not <br /> properly position the assembled DBF It applicator gun to Parts in kit: <br /> "fill"the repair. The Remote Fill parts provide a flexible Repair Boot,Split URBKZ 4—x.x (to match pipe size) <br /> extension for the filling process. 2 clamps 1#72,1#xx(see chart above) <br /> RF Adapter 24"tube with male&female ends Fill Port Plug RFA xPiug f <br /> RFATube-24 'r4"Tubing in 24"lengths Repair Instructions <br /> RFATube %:"Tubing in 200'length roll <br /> RFATubexTube Yz"Tube Coupling <br /> RFA xFemale W Tube-Female Fill Port end i <br /> RFA xMale 'r4"Tube-Male Fill Port end ' <br /> RFA xPiug h"Tube-Male Plug for fill port <br /> Diversified Products Manufacturing Inc.Environ Repair Manual Full Version Rev 3 Page 40 of 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.