Laserfiche WebLink
Multi-Sync Repair Instructions <br /> AW <br /> r�sQR For Environ 1`10 Stud GDB Series" Repair Kit <br /> This kit provides the Multi-Sync Repair parts,using a plug or insert,for existing Flex Pipe <br /> ruin . from 2.7"up to 3.6"OD inside 4"Corrugated Ducting for applications where the pipe is <br /> coming thru the sump wall either straight or at excessive angles. <br /> MSZ ENV GDB 10-xx <br /> For Environ repairs with WARNING.-Prepare all surfaces to be bonded prior to completing Installation steps below. <br /> Lar i Failure to follow each step will void warranty&may result in premature failure of penetration fitting. <br /> Large p ill CDS This Kit applies for revalring:Environ GDB 70QD Series Harts j <br /> Page 1 with piping from 2.7" up to 3.6"OD <br /> Rev 4 6-25-2009 <br /> General Instructions for: CLEANING:Spray all surfaces to be bonded with DBC Cleaner and allow to air dry or wipe excess with a clean dry f <br /> cloth. Surfaces must be dry before applying bonder. j <br /> General Instructions for: BONDING TO POLY SUMPS OR FIBERGLASS SUMPS: Clean,sand and rough up sump surfaces. Clean fitting and <br /> apply DBB V between Bonding Ring&sump wall. <br /> STEP 1: Loosen Nuts&pull Back Metal Ring STEP 2: Clean all Repair Components STEP 3: Place&Dry Ft Bonding Ring&SleeveReove <br /> • Clean all repair components with DBC Note: Make sure Bonding Ring Is placed with the Sealing <br /> • Pulll backNuts „ <br /> metal mounting flange&discard prior to installation Groves"positioned toward the sump wall i <br /> • Cut off old boot&discard • Place the split bonding ring with Cuff over the pipe with <br /> • Cut away old Green CDI&discard Split Bonding Cleaner Split the seating grooves toward the sump wall <br /> Y • Place the bonding ring over the studs <br /> • Cut away old insert&discard Ring with Sleeve <br /> Cuff_. Place the CDI over the pipe&into the Corrugated <br /> • Clean off any'paste'or other bonders _ Ducting <br /> from around the Environ body&sump _'' Place the split sleeve over the pipe&up to the bonding <br /> wall, _; ring with the fill port up <br /> • Clean&sand sump wall <br /> • Spray Environ Body&sanded.sump wall <br /> ;. <br /> j <br /> with DBC cleaner` ve <br /> Plug for _ fob - 1 <br /> Corrugated Solit Insert <br /> Field Drilling <br /> Duct Insert - <br /> r <br /> OPE <br /> ' r ,_ <br /> r <br /> — STEP 5: Install CDI&Bonding Ring STEP 6: Install The Sleeve <br /> eVf!rtlin15� t .ilt -"_ Slide CDI into place&seal any openings with • Seal around the existing boot &pipe if needed. <br /> _ <br /> i <br /> - DRP Repair paste.Use one of the existing Position the sleeve with the fill port at the top <br /> ` ' damps to clamp in place. once you have the sleeve lined up correctly, <br /> - - ...= <br /> = =_?V '= f Apply DBB V to the sump side of the Bonding 1.Apply a bead of Zip-Tite all around the outer <br /> x - <br /> .tt Ring and slide it over the studs&up to the edges of the bonding ring Cuff i <br /> ' = = <br /> 2.Slide sleeve over bonding ring Cuff&snap In <br /> sump wall I <br /> • Thread on the flange nuts. place(fill port at top) I <br /> Note:Tighten the flange nuts"snugly". 3.Set the Clamp,#96,the around the sleeve& <br /> ~ pa not over-tighten. Snug is ok. over.the bonding ring and tighten"snugly". <br /> • Wipe any excess DBB V off the bonding ring <br /> STEP 4: Bond Sleeve,CDi,&Bonding Ring • Spray DBC onto cloth&wipe clean the outer = '_- <br /> • Apply Zip Tile to the split bonding ring. edges of the bonding ft. <br /> Use 2 of the clamps,#132&96,to hold in DBB V goes on <br /> place while curing. "grooved"side <br /> • Apply Zip-Tite to the CDI. Use 1 of the __ - - _ - toward sump <br /> clamps,#72,to hold in place while <br /> curing. _ Zip-Tite here <br /> • Apply Zip-Tite to the split sleeve and use 2 <br /> damps,#96,to hold in place while ' <br /> curing. <br /> • Leave these clamps in place for approx 30 You must seal any open spaces between the <br /> minutes for curing before proceeding to pipe &CDI and the CDI &the Corrugated _- _ - . <br /> the next step Ducting <br /> Fill port on top <br /> I <br /> Sleeve in place over"Cuff"with clamp <br /> fill <br /> k V <br /> Bonding Ring in place. 5 <br /> Wipe any excess DBB V from outer edge <br /> Diversified Products Manufacturing inc.Environ Repair Manual Full Version Rev 3 Page 41 of 70 l <br />