My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Multi-Sync Repair Instructions <br /> For Environ Direct Burial Series "8 Stud" Repair Kit <br /> FEThis kit provides the Multi-Sync Repair parts for existing Flex or FRP Pipe from 2.7"OD to <br /> 3.6"OD In Direct Burial applications where the pipe Is coming thru the sump wall either <br /> straight or at excessive angles. <br /> MSZ ENV FEB 8-xx <br /> WARNING:Prepare all surfaces to be bonded prior to completing Installation steps below. <br /> For Environ repairs with Failure to follow each step will void warranty&may result in premature failure of penetration fining. <br /> Direct Burial Large Pipe This Kit an2lies for repairing:Environ FEB 6000 Series carts <br /> Page I With piping frim 2.Z"to 3.6"OD <br /> Rev 3 6-242009 <br /> General Instructions for: CLEANING:Spray all surfaces to be bonded with DBC Cleaner and allow to air dry or wipe excess with a clean dry <br /> cloth. Surfaces must be dry before applying bonder. <br /> General Instructions for. BONDING TO POLY SUMPS OR FIBERGLASS SUMPS: Clean,sand and rough up sump surfaces. Clean fitting and <br /> apply_DBB V between Bonding Ring&sump wall. <br /> STEP 1: Loosen Nuts&pull Back Metal Ring STEP 2: Clean all Repair Components STEP 3: Place&Dry Fit Bonding Ring&Sleeve <br /> . Clean all repair components with DBC Note: Make sure Bonding Ring Is placed with the"Seating <br /> • Remove Nuts Groves"positioned toward the sump wall <br /> • Pull back metal mounting flange&discard prior to installation - Place the split bonding ring with Cuff over the pipe with <br /> • Clean off any'paste'or other bonders from <br /> Split Bonding Cleaner Split the sealing grooves toward the sump wall <br /> around the Environ body&sump wall Ring Sleeve - Place the bonding ring over the studs <br /> • Clean&sand sump wall - Place the split sleeve over the pipe&up to the bonding <br /> • Spray Environ Body 9t sanded sump wall ring With the fill port up <br /> with DBC cleaner <br /> • If needed.Patch old boot to seal back wall <br /> Split Insert Multi-Sync <br /> Reducer <br /> % <br /> ... .... .... ... ... <br /> STEPS: Install C <br /> of&Bonding Ring STEP 6: Install The Sleeve <br /> b <br /> Apply DBB Vto the sump side of the Bonding Seal around the existing boot &pipe If needed. <br /> Ypird h M �WM" <br /> Ring and slide It over the studs&up to the Position the sleeve with the fill port at the top <br /> AltS sump wall Once you have the sleeve lined up correctly, <br /> Thread on the flange nuts. <br /> 1.Apply a bead of Zip-Tite all around the outer <br /> .. .... Note:lighten the flange nuts Isnugir. edges of the bonding ring Cuff <br /> Do not Over-tighten. Snug Is ok. 2.Slide sleeve over bonding ring Cuff&snap In <br /> * Wipe any excess DBB V off the bonding ring place(fill port at top) <br /> - Spray DBC onto cloth&wipe clean the outer 3.Set the clamp,#96,the around the sleeve& <br /> edges of the bonding ring. over the bonding ring and tighten"snugly". <br /> ............ <br /> STEP 4: Bond Sleeve&Bonding Ring <br /> • Apply Zip-Tite to the split bonding ring. <br /> Use I clamp,#96,to hold in place while DBB V goes on <br /> curing. ,"groovedm side <br /> • Apply Zip-TIte to the split sleeve and use 2 Jioward sump <br /> clamps,#96,to hold in place while <br /> curing. <br /> • Leave these clamps in place for approx 30 <br /> Zip-Tite here <br /> minutes for curing before proceeding to <br /> the next step <br /> You <br /> must seal any open spaces between the <br /> Fill port on top <br /> Riles &the old Environ boot <br /> [ <br /> Sleeve In place over'Cuff"with clamp <br /> Bonding Ring In place; <br /> Wipe any excess DBB V from outer edge <br /> Diversified Products Manufacturing Inc.Environ Repair Manual Full Version Rev 3 Page 49 of 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.