My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
How the Multi -Sync <br /> f ,JJJ,,,JJ11 <br /> _Z <br /> Part 2—The Eccentric Insert & Multi-Sync Reducer Split Eccentric Split Multi-Sync <br /> Step 4: Install & Bond Eccentric Insert& Multi-Sync Reducer Back Together Insert Reducer <br /> • Wrack Eccentric Insert around the pipe - � <br /> • Wrack Multi-Sync Reducer around the pipe <br /> • Apply DBB III to split area on Eccentric Insert, press ends together&clamp <br /> • Apply DBB III to split area on Multi-Sync Reducer, press ends together& clamp � <br /> Step 5: Install The Eccentric Insert& Multi-Sync Reducer <br /> • Dry fit the Eccentric insert. Make sure it fits properly over the pipe & inside the sleeve. <br /> • Dry fit the Multi-Sync Reducer <br /> • Adjust the positions so that they lineup properly with the Repair Sleeve & Pipe. <br /> Note: A proper fit will not cause extra pressure or force to the sleeve and will allow a <br /> longer lasting repair. <br /> • Once you have the part lined up correctly <br /> 1.Pull back the Multi-Sync Reducer& Eccentric Insert <br /> 2.Apply DBB III bonder all around the Eccentric Insert, <br /> 3.Slide Eccentric into the Repair sleeve in the proper position <br /> 4.Apply DBB III bonder all around the Multi-Sync Reducer <br /> 5.Slide the Multi-Sync Reducer into it's proper place <br /> 6.Set the Clamp the around the sleeve &over the Eccentric Insert and tighten "snugly". <br /> 7.Set clamp over reducer end on the pipe &tighten enough to create a seal around the <br /> pipe. <br /> Step 6: Fill the part with DBF II Polysulfide <br /> • Slowly fill the repair with DBF II <br /> • Use the "Remote Fill" option if space is limited around the repair <br /> • Cleanup &you are done <br /> • Can be Hydro-static tested after 1 hour <br /> Lit CIO Multi Sync Repairs 3/11/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.