Laserfiche WebLink
1 <br /> I <br /> 1 <br /> _ l <br /> Multi-Sync Repair InstructionsAD <br /> f <br /> rDP <br /> For Environ FEB 3100 Series Repair Kit <br /> U E:M:4;aR uM) <br /> This Kit provides the Multi-Sync Repair parts for 1"Environ Flex Pipe,1"or%"Rigid Steel <br /> M* RSRF conduits in applications where the conduit pipe is coming thru the sump wall either straight <br /> or at excessive angles. For PVC coated conduits and conduits smaller than Y4",consult the <br /> MSZ ENV 3100-X.X <br /> factory. <br /> For Environ Conduit Repairs WARNING:Prepare all surfaces to be bonded prior to completing installation steps below. <br /> Page 1 Failure to follow each step will void warranty&may result In premature failure of penetration fitting. <br /> Rev 2- 6-22-2009 This Kit applies to repairing• Environ FEB 815? 3100 3075 &3050 parts <br /> General Instructions for: CLEANING:Spray all surfaces to be bonded with DBC Cleaner and allow to air dry or wipe excess with a clean dry <br /> cloth. Surfaces must be dry before applying bonder. <br /> General instructions for: BONDING TO POLY SUMPS OR FIBERGLASS SUMPS: Clean,sand and rough up sump surfaces. Clean fitting and <br /> apply 268 V between Bonding Ring&sump wall. On Poly Sumps if sump wall is un-even use DRP in place of DBB V. <br /> STEP Z: Clean all Repair Components STEP 3: Place&Dry Fit Bonding Ring&Sleeve <br /> STEP 1: Loosen&Clean Mounting Plata Clean all repair components DBC Note: Make sure Bonding Ring is placed over the studs <br /> s w <br /> • Remove clamp on the reducer at the pipe between the sump wall&the mounting plate,with <br /> • Remove the nuts from the mounting plate prior to installation "Sealing Groves"positioned toward the sump wail and <br /> • Pull back the mounting plate Cleanertit the split part of the bonding ring toward the top <br /> • Clean off any'paste'or other bonders Split Sp Place the split bonding ring over the studs,between <br /> from around old Environ body&sump Bonding SleeveRina the sump wall&the metal plate with the sealing <br /> wall, grooves toward the sump wall. <br /> • Seal up any cracks or ri in rubber boot * Rx• Snug up the metal plate with a couple of flange nuts <br /> m o Place the split sleeve over the pipe&Up to the <br /> • Clean&sand sump wail <br /> • Spray Environ body&sanded sump wall i' bonding ring with the fill port up <br /> - If everything fits properly,then loosen the nuts&pull <br /> with DBC cleaner p= = <br /> back the mounting plate again to bond the parts <br /> s together. - I <br /> Eccentric insertMulti-Sync i <br /> Reducer <br /> VN <br /> You must seal any open spacefF <br /> between the pipe &old boot area <br /> 1 <br /> STEP S. Install Bonding Ring&Mounting Plate STEP 6: Install The Sleeve <br /> '.If est@trth6rlg fi#S Ct�ttieu� `-v Apply DBB V to the sump side of the Bonding Seal around old boot&pipe,if needed <br /> —x_..-.... <br /> ,.��� �,� A'�;� '1'i�� =:-�' Ring and slide it over the studs&up to the Slide in the sleeve with the fits port at the op. <br /> sump wall DO NOT push the sleeve over the snap ring <br /> ��x9Ekl <br /> once you you have the sleeve lined up correctly, <br /> ��- -- Slide in the mounting plate <br /> _ Reinstall the flange nuts.Tighten snugly 1.Pull back the sleeve a little <br /> • Reinstall the pipe clamp on the old boot 2.Apply a bead of DBB IIl all around the outer <br /> Note: Do not Over-tighten. Snug is ok edges of the bonding ring <br /> • Wipe any excess DBB V off the bonding ring 3.Slide sleeve over bonding ring&snap in place <br /> • Spray DBC onto cloth&wipe clean the outer (fill port at top) <br /> 4 Set the Clamp the around the sleeve&over <br /> " _.:_........::.... . edges of the bonding ring. <br /> the bonding ring and tighten"snugly". <br /> STEP 4: Bond Sleeve&Bonding Ring <br /> • Apply DBB Ill to split bonding ring. Use 1 -6- <br /> of the clamps to hold in place while <br /> curing. o <br /> • Apply DBB ill to the split sleeve and use 2 _ <br /> clamps to hold in place while curing. <br /> • Leave these clamps in place for approx 30 <br /> minutes for curing before proceeding to D88 V goes on"grooved" <br /> the next step side toward sump DBB 111 here <br /> Fill port on top <br /> Bonding Ring in place. <br /> Sleeve in place with clamp <br /> Old clamp in place + <br /> Wipe any excess DBB V from outer edge <br /> . <br /> Diversified Products Manufacturing Inc. 5523 Baggett Marysville Road,Oroville,CA 95965 530-534-3966 www.dpm-Ilc.com <br />