Laserfiche WebLink
I <br /> i <br /> f <br /> Multi-Sync Repair Instructions0DP ! <br /> For Environ Direct Burial Series "8 Stud" Repair Kit i <br /> This wM) fq:, kit provides the Multi-Sync Repair parts for existing Flex or FRP Pipe from 1.8'°up to <br /> V.„ ; 2.7'OD in Direct Burial applications where the pipe is coming thru the sump wall either r <br /> straight or at excessive angles. <br /> MSZ ENV FES 8-XX WARNING:Prepare all surfaces to be bonded prior to completing installation steps below. <br /> For Environ repairs with Failure to follow each step will void warranty&may result in premature failure of penetration fitting. <br /> Direct Burial Small Pipe This Kit applies f r repairing:Environ FEB 6000 Series parts i <br /> Page 1 With piping from 1&up to 2.7" OD <br /> Rev 3 6-26-2009 <br /> General Instructions for: CLEANING:Spray all surfaces to be bonded with DBC Cleaner and allow to air dry or wipe excess with a clean dry s <br /> cloth. Surfaces must be dry before applying bonder. <br /> General Instructions for: BONDING TO POLY SUMPS OR FIBERGLASS SUMPS: Clean,sand and rough up sump surfaces. Clean fitting and 1 <br /> apply DBL V between Bonding Ring&sump wall. On Poly Sumps if sump wall is un-even use DRP in place of DBB V. <br /> STEP 2: Clean all Repair Components STEP 3: Place&Dry Fit Bonding Ring&Sleeve <br /> STEP 1: loosen Nuts&pull Back Metal Ring Clean all repair components with DBC Note: Make sure Bonding Ring Is placed with the"Seating <br /> • Remove Nuts Groves"positioned toward the sump wail <br /> • Pull back metal mounting flange prior to installation Place the split bonding ring over the pipe with the <br /> • Clean off any'paste'or other bonders Split Bonding Cleaner Split sealing grooves toward the sump wall `. <br /> from around the Environ body&sumpRing Sleeve Place the bonding ring over the studs <br /> wall, Push metal mounting flange over the studs <br /> • Clean&sand sump wall r Place the split sleeve over the pipe&up to the bonding <br /> • Spray Environ Body&sanded sump wall ring with the fill port up <br /> with DBC cleaner �= j <br /> f� <br /> • If needed patch old boot to seal back wall _ °:i t <br /> Eccentric Insert Multi-Sync <br /> Reducer <br /> - <br /> educe <br /> t •�,5-c1 <br /> t <br /> u x Ar,* ti <br /> 0 ` <br /> STEPS: Install the Bonding Ring STEP 6: install The Sleeve <br /> _ 1r1 (f1f@" ;: Apply DBB V to the sump side o#the Bonding Seal around the existing boot &pipe if needed. <br /> _*._=-• I port at the <br /> Cilsti # _ Ring and slide it over the studs&up to the OncPose you have the sleevon the sleeve with e lined up correctly,p <br /> -.- sump wall <br /> Slide on the metal mounting flange 1.Apply a bead of Zip-Tate all around the outer <br /> - Thread on the flange nuts. edges of the bonding ring Cuff <br /> Note:Tighten the flange nuts"snugly". <br /> 2.Slide sleeve over bonding ring Cuff&snap in <br /> Do not Ower-tighten. Snug is ok. place(fill port at top) <br /> _ Wipe any excess DBB V off the bonding ring 3.Set the Clamp,#96,the around the sleeve& <br /> • Spray DBC onto cloth&wipe clean the outer over the bonding ring and tighten"snugly". <br /> edges of the bonding ring. <br /> STEP 4: Bond Sleeve&Bonding Ring DBB V goes on _- <br /> • Apply Zip-Tite to the split bonding ring. "grooved"side - <br /> Use 1 clamp,#96,to hold in place while <br /> °� ..... toward sump _= • <br /> curing. e - <br /> • Apply Zip-Tite to the split sleeve and use 2 .a <br /> clamps,#96,to hold in place while - p-Tite here <br /> curing. - _ <br /> • Leave these clamps in place for approx 30 a ~ <br /> minutes for curing before proceeding to <br /> the next step <br /> - <br /> You must seal any open spaces between the <br /> pipe &the old Environ boot - - - -- <br /> Fill port on top <br /> v. <br /> - Sleeve 4ce over"Cuff'with clamp <br /> o _ <br /> Bonding Ring in place. <br /> ° <br /> Wipe any excess DBB V from outer edge <br /> Diversified Products Manufacturing Inc. 5523 Baggett Marysville Road,Orovilie,CA 95965 530-534dpm-llc.com <br /> 3966 www. <br />