Laserfiche WebLink
Page V of 6 <br /> 7.UM&DISPENSER CONTAINMENT(UD TING <br /> Test Method Developed By: UDC Manufacturer D Industry Standard ® Professiona7Eng7ineer <br /> 711 <br /> Other(Specify) <br /> Test Method Used: Pressure D Vacuum D Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Wayne Perry Inc. See Attached Testing Results Equipment Resolution: .00007 <br /> IN <br /> Under-Dispenser Containment Number Below <br /> - <br /> UDC Manufacturer: <br /> UDC Material_- 3- <br /> UDC Depth: A9 ` <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: N 41,6111 , <br /> Portion of UDC Tested' 2"Above Highest 2"Above Highest 2"Above Highest 2"Above Highest <br /> Penetration Penetration Penetration Penetration <br /> Does turbine shut down when D Yes D No NAO D Yes D No NA® D Yes D No NA® D Yes D No NA® <br /> UDC sensor detects liquid. <br /> Turbine shutdown response time D Yes D No NA® D Yes D No NA® D Yes D No NAD D Yes D No NA® <br /> Is system programmed for fail- D Yes D No NA® D Yes D No NA® D Yes D No NA® D Yes D No NA® <br /> safe shutdown?* <br /> Was fail-safe verified to be D Yes D No NA® D Yes D No NA® D Yes D No NAM D Yes D No NA® <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test <br /> Test Start Time: -2:60 <br /> y 3 .25 <br /> Initial Reading(RO: P2.2 y 71, 1_e f yz2..3j1.s1' <br /> Test End Time: ; <br />