My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1469
>
2300 - Underground Storage Tank Program
>
PR0231126
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2021 1:51:31 PM
Creation date
6/23/2020 6:44:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231126
PE
2361
FACILITY_ID
FA0001570
FACILITY_NAME
UNITED # 5447
STREET_NUMBER
1469
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
08818030
CURRENT_STATUS
01
SITE_LOCATION
1469 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231126_1469 E HAMMER_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />OPW Installation, Operation, and Maintenance Manual, Page 57 <br />STEP 3: CUT THE UPPER DROP TUBE <br />Attach the supplied band clamp to the upper tube <br />just below the mark and ensure that it is assembled <br />square to the tube. The clamp can be used as a <br />guide for maldng a square out. If a vise is used, <br />clamp on the valve body casting only to avoid <br />damage to the float and tubes (See Figure 3A). <br />Carefully saw through the tube squarely, at the mark <br />made in Step 2. Use a hacksaw with a new fine- <br />tooth blade. Rotating the upper tube as the sawing <br />progresses will minimize run out and ensure a <br />square 90 -degree cut. Remove the band clamp <br />after tube is cut. <br />CAUTION -DO NOT use a pipe or tubing cutter to <br />cut the upper drop tube, this may damage the tube, <br />causing it to be out of round thereby prohibiting <br />assembly of the unit. <br />IMPORTANT: Remove all chips and shavings <br />generated in steps 3 through 5 out of the cut end of <br />the tube. DO NOT remove chips and shavings by <br />dumping through valve body. <br />rigure scs <br />Executive Order VRA 02-K <br />STEP 4: FILE THE UPPER DROP TUBE <br />File the upper tube square, and remove any burrs or <br />rough edges. Make sure the cut is flat and square. <br />IMPORTANT: Carefully file a good chamfer on the <br />inside edge of the drop tube to provide a lead-in for <br />the polypak seal and inlet tube installed in step 8. <br />half round file <br />Figure 4 <br />STEP 5: SAND THE UPPER DROP TUBE <br />Sand the inside of the drop tube with sandpaper <br />and/or steel wool to remove all burrs and sharp <br />edges. After sanding wipe down the inside of the <br />tube with a clean rag from the top to approximately 4 <br />inches down to remove any debris. <br />Caution: Failure to properly chamfer, sand, and <br />clean the drop tube may cut the seal and result <br />in a failure of a pressure decay leak test. <br />Figure 5 <br />grit sandpaper <br />OPW 71 SO Overfill Prevention Valve Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.