Laserfiche WebLink
SWRCB, January 2002 0 <br />is Page _5_ of —8- <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: INCON SUMP <br />TESTER <br />Equipment Resolution: + / _ 0.002" <br />UDC#1 -2 <br />BRAVO PAN <br />UDC#3-4 <br />UDC #5-6 <br />UDC #7-8 <br />UDC Manufacturer: <br />BRAVO PAN <br />BRAVO PAN <br />BRAVO PAN <br />UDC Material: <br />STEEL <br />STEEL <br />FIBERGLASS <br />FIBERGLASS <br />UDC Depth: <br />12" <br />21" <br />28" <br />281- <br />8"Height <br />Heightfrom UDC Bottom to Top <br />NIA <br />N/A <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />N/A <br />N/A <br />9" <br />9" <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />DRY <br />DRY <br />DRY <br />DRY <br />testing: <br />Portion of UDC Tested <br />ABOVE <br />ABOVE <br />ABOVE <br />ABOVE <br />PENTERATION <br />PENTERATION <br />PENTERATION <br />PENTERATION <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No ®NA <br />product and water)?' <br />Turbine shutdown response time <br />NIA <br />NIA <br />N/A <br />N/A <br />Is system programmed for fail- <br />❑Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />❑Yes ❑No ®NA <br />[—]Yes ❑No ®NA <br />safe shutdown?* <br />Was fail-safe verified to be <br />❑Yes [:]No ZNA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ®NA <br />o erational? <br />Wait time between applying <br />pressure/vacuum/water and <br />10 MIN <br />10 MIN <br />10 MIN <br />10 MIN <br />starting test <br />Test Start Time: <br />VISUAL FAIL <br />8:51 AM <br />8:15 AM <br />VISUAL FAIL <br />Initial Reading (Ri): <br />1.8664" <br />4.3314" <br />Test End Time: <br />9:06 AM <br />8:30 AM <br />Final Reading (RF): <br />1.8669" <br />4.3313" <br />Test Duration: <br />15 MIN <br />15 MIN <br />Change in Reading (RF -Rt): <br />0.0005" <br />-0.0001" <br />Pass/Fail Threshold or Criteria: <br />+/- 0.002" <br />+/-0.002" <br />+/-0.002" <br />+/-0.00211Fail <br />®Pass ❑ F0i1.]ssa# <br />Was sensor removed for testing? <br />® Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />®Yes ❑ No ❑ NA <br />®Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />®Yes ❑ No ❑NA <br />®Yes ❑ No ❑ NA <br />®Yes ❑ No ❑ NA <br />®Yes ❑ No ❑ NA <br />verified functional after testing? <br />11 <br />1 <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />ABOVE IS THE LAST OF TWO BACK TO BACK 15 MINUTE TESTS <br />ABOVE UDCS HAVE BEAUDREAU ELECTRIC 406 STAND-ALONE SENSORS INSTALLED FOR SECONDARY LEAK <br />DETECTION. SENSOR ONLY SHUT -DOWN POWER TO DISPENSER ONLY WHEN PRESENT & DETECTED. <br />UDC# 7-8 91 SUPREME PRODUCT SECONDARY TERMINATION BOOT IS TORN -- NEEDS TO BE REPLACED (DISPENSER <br />IS VERY TIGHT WITH LITTLE ROOM) MAY NEED TO BE REMOVED TO INSTALL TEST BOOT. TEST BOOT CAUSES <br />VISUAL FAILURE ON UDC# 7 - 8. <br />UDC# 1 - 2 HAS VISUAL LIQUID LOSS WITHIN 15 MINUTES - LEAK POINT NOT VERIFIED <br />1 If the entire depth of the UDC is not tested, specify how much was tested. If the answer to anv of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />