Laserfiche WebLink
S WRCB, January 2002 <br />TUNDER-DISPENSER CONTAINMENT (UDC) TESTING <br />Page _6_ of _8_ <br />Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: INCON SUMP <br />TESTER <br />Equipment Resolution: + / - 0.002" <br />UDC # 9 - 10 <br />UDC # <br />UDC # <br />UDC # <br />UDC Manufacturer: <br />BRAVO PAN <br />UDC Material. <br />FIBERGLASS <br />UDC Depth: <br />28" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />11 " <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />91, <br />Condition of UDC prior to <br />testing: <br />DRY <br />Portion of UDC Tested <br />ABOVE <br />PENTERATION <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?' <br />❑ Yes ❑ No ® NA <br />❑ Yes [:]No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No [:INA <br />Turbine shutdown response time <br />N/A <br />Is system programmed for fail- <br />safe shutdown?" <br />❑ Yes ❑ No ®NA <br />❑ Yes [:]No ❑NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />❑ yes ❑ No ®NA <br />❑ Yes ❑ No []NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />10 MIN <br />Test Start Time: <br />1:23 PM <br />Initial Reading (R,): <br />5.9990" <br />Test End Time: <br />1:38 PM <br />Final Reading (RF): <br />6.0020" <br />Test Duration: <br />15 MIN <br />Chane in Reading (RF -R,): <br />0.0030" <br />Pass/Fail Threshold or Criteria: <br />+l- 0.002" <br />+1-0.002" <br />+/- 0.002" <br />+/-0.00211 <br />❑ .Pass Fa;ilI; <br />pSS >Fttil <br />Pass ❑ Farl <br />❑ Pi �Y i' ',. <br />__ <br />Was sensor removed for testing? <br />®Yes [-]No ❑NA <br />® Yes [:]No ❑NA <br />®Yes ❑ No ❑ NA <br />® Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testin ? <br />[_-]No ❑ NA <br />®Yes❑ <br />No❑ <br />® Yes [:]NA <br />® Yes No ❑ NA <br />®Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />ABOVE IS THE LAST OF TWO BACK TO BACK 15 MINUTE TESTS <br />ABOVE UDCS HAS BEAUDREAU ELECTRIC 406 STAND-ALONE SENSORS INSTALLED AS SECONDARY LEAK <br />DETECTION. SENSORS ONLY SHUT -DOWN POWER TO DISPENSER WHEN LIQUID IS PRESENT AND DETECTED. <br />UDC# 9 -10 TEST RESULTS ARE INCONCLUSIVE DUE TO HEAVEY WINDS - COULD NOT GET WATER TO STABILIZE <br />DURING TEST -- RETEST NEEDED. <br />t If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />