My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 2:49:25 PM
Creation date
6/23/2020 6:46:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO â(SPEEDWAY)â 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231320_35 N CHEROKEE_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB -25-2011 15:49 Service Station Systems 408 938 8888 P.09 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes p <br />Spill/Overfill Containment Boxes are Present, but Were Not Tested [1 <br />Test Method Developed By: â Spill Bucket Manufacturer ® Industry Standard C] Professional Engineer <br />p Other (Sped) <br />Test Method Used: p Pressure p Vacuum ® Hydrostatic <br />Ll Other (Specify) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br />Vapor Spill Box # 87 Vapor Spill Box # 89 Vapor Spill Box âŽt 91 <br />Bucket Diameter: <br />12" i2" 12" <br />Bucket Depth: <br />10" 10" 10" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 min. 10 min. 10 min. <br />Test Start Time: <br />8:27 am 8:27 am 8:27 am <br />Initial Reading (RI): <br />Test End Time: <br />_6.6581 6.7672 5.5787 <br />8:42 am 8:42 am 8:42 am <br />Final Reading (Rf): <br />6.6580 6.7670 5.5787 <br />Test Duration: <br />15 min. 15 min. 15 min. <br />Change in Reading (RF-Ri): <br />-0.0001 -0.0002 None <br />Pass/Fail Threshold or <br />Criteria: <br />T@st Result: <br />+/-0.002" +/-0.002" +/-0.002" <br />® Pass 0 Fail ® Pass 0 Fait lel Pass 0 Fail <br />Comments -- include information on repairs made prior to testing, and reeommendedfollrne-u or failed tests <br />TOTAL P.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.