Laserfiche WebLink
FEB -25-2011 15:49 Service Station Systems 408 938 8888 P.09 <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes p <br />Spill/Overfill Containment Boxes are Present, but Were Not Tested [1 <br />Test Method Developed By: ❑ Spill Bucket Manufacturer ® Industry Standard C] Professional Engineer <br />p Other (Sped) <br />Test Method Used: p Pressure p Vacuum ® Hydrostatic <br />Ll Other (Specify) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: +/-0.002" <br />Vapor Spill Box # 87 Vapor Spill Box # 89 Vapor Spill Box ₮t 91 <br />Bucket Diameter: <br />12" i2" 12" <br />Bucket Depth: <br />10" 10" 10" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 min. 10 min. 10 min. <br />Test Start Time: <br />8:27 am 8:27 am 8:27 am <br />Initial Reading (RI): <br />Test End Time: <br />_6.6581 6.7672 5.5787 <br />8:42 am 8:42 am 8:42 am <br />Final Reading (Rf): <br />6.6580 6.7670 5.5787 <br />Test Duration: <br />15 min. 15 min. 15 min. <br />Change in Reading (RF-Ri): <br />-0.0001 -0.0002 None <br />Pass/Fail Threshold or <br />Criteria: <br />T@st Result: <br />+/-0.002" +/-0.002" +/-0.002" <br />® Pass 0 Fail ® Pass 0 Fait lel Pass 0 Fail <br />Comments -- include information on repairs made prior to testing, and reeommendedfollrne-u or failed tests <br />TOTAL P.09 <br />