My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 2:49:25 PM
Creation date
6/23/2020 6:46:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231320_35 N CHEROKEE_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
&I a V *1 IMM <br />Test Method Developed By: El Piping Manufacturer Industry Standard 0 Professional Engineer <br />0 Other (,Spec) <br />Test Method Used: 0 Pressure [I Vacuum 0 Hydrostatic <br />El Other (Specify) <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges Equipment Resolution: 0.5% of span <br />Piping Run # 87 <br />Piping Run # 91 <br />111M <br />Piping Run # Diesel <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />100, <br />100, <br />100, <br />Product Stored: <br />Gasoline <br />Gasoline <br />Diesel <br />Method and location of <br />2iping-run isolation: <br />Reducer Boots&itfings <br />Reducer Boots/Fittings <br />Reducer Boots/Fittings <br />Wait time between applying <br />pressure/vacuum/water and <br />startina test: <br />10 minutes <br />10 minutes <br />10 minutes <br />Test Start Time: <br />8:00 am <br />8:00 am <br />8:00 am <br />Initial Reading (Rj): <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />9:00 am <br />9:00 am <br />9:00 am <br />Final Reading (RF): <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />I hr. <br />I hr, <br />I hr. <br />Change in Reading (RF -R,): <br />None <br />None <br />None <br />Pass/FailThreshold or <br />Criteria: <br />No detectable Loss <br />No detectable Loss <br />No detectable Loss <br />Test Result: <br />El Pass 0 Fail <br />191 Pass D Fail <br />191 Pass 0 Fail <br />. Comments — (include information on repairs madeprior to testing, and recommended follow-uELorfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.