My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_2012-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 3:36:41 PM
Creation date
6/23/2020 6:47:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2017
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_2012-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: ®Piping Manufacturer ® Industry Standard <br />130ther (Spec) <br />Test Method Uses: ® Pressure Q Vacuum <br />®mer (Specify) <br />Test Equipment Used: 0 TO 15 PSI GLYCERIN FILLED PRESSURE GUAGE4 Equipment <br />Page 3 of i <br />Engineer <br />0.1 PSI <br />pressure/vacuum/water and <br />starting test: <br />Piping Run # S/R polisher <br />Piping Run #S/Rgeneratot <br />Piping Run #su ply polish <br />Piping Run # <br />Piping Material: <br />plastic <br />plastic <br />plastic <br />5 PSI <br />Piping Manufacturer: <br />total containment <br />total containment <br />total containment <br />Piping Diameter: <br />4" <br />4" <br />4" <br />Length of Piping Run: <br />45' <br />45' <br />8' <br />Product Stored: <br />diesel <br />diesel <br />diesel <br />Method and location or <br />piping -run isolation: <br />4" test donut <br />4" test donut <br />4" test donut <br />pressure/vacuum/water and <br />starting test: <br />30 MIN. <br />30 min. <br />30 min. <br />Test Start Time: <br />11:00 AM <br />11:00 am <br />11:00 am <br />Initial Reading (RI): <br />5 PSI <br />5 psi <br />5 psi <br />Test End Time. <br />12:00 PM <br />12:00 pm <br />12:00 pm <br />Final Reading (RF): <br />5 PSI <br />5 psi <br />5 psi <br />Test Duration: <br />1 HOUR <br />i hour <br />1 hour <br />Change in Reading (RF-Rl): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />0 <br />0 <br />0 <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />SES 18 2014 <br />ENVIRONMENTAL <br />DEPARTMENT <br />Revision: <br />
The URL can be used to link to this page
Your browser does not support the video tag.