My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
430
>
2300 - Underground Storage Tank Program
>
PR0231425
>
COMPLIANCE INFO_2012-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 3:36:41 PM
Creation date
6/23/2020 6:47:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2017
RECORD_ID
PR0231425
PE
2361
FACILITY_ID
FA0003838
FACILITY_NAME
Frontier California Inc.: Manteca CO
STREET_NUMBER
430
Direction
W
STREET_NAME
CENTER
STREET_TYPE
St
City
Manteca
Zip
95336
APN
217-021-04
CURRENT_STATUS
01
SITE_LOCATION
430 W Center St
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231425_430 W CENTER_2012-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If the testing method does not test the entire sump, specify how much of the sump was tested Methods not testing the <br />entire sump should only be used if the monitoring system provides fail-safe shutdown. (See SWRCB LG -160) <br />'With the submersible pump running, place the sensor in product (discriminating sensors should be placed in water). The time <br />between placing the sensor in product and the turbine shutting down is the response time. This should be done if the secondary <br />containment method used does not test the entire volume of the sump. <br />* This information is not needed if the entire sump is tested. <br />Revision: <br />SWRCB, January 2002 <br />Page 4 of 7 <br />6. PIPING SUMIP TESTING <br />Test Method Developed By: <br />Sump Manufacturer ® Industry Standard OProfessional Engineer <br />13 Oder (Spedy) <br />Test Method Uses: <br />®Pressure ®Vacuum ®Hydrostatic <br />Other (Speci& <br />Test Equipment Used: incon is-sts <br />Equipment Resolution: 0.001" <br />Sum # 1 Sum # Sum # Sum # <br />Sump Diameter. <br />36" <br />Sump Depth: <br />45" <br />Sump Material: <br />fiberglass <br />Height from Tank Top to Highest <br />21" <br />Piping Penetration: <br />Height from Tank Top to Lowest <br />17" <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />good <br />Portion of Sump Tested' <br />23" 8 2014 <br />Does turbine shut down when <br />sump sensor detects either product <br />na ENVIRON MENTAL HEALTF <br />or water? <br />Turbine shutdown response time t# <br />na <br />Is system programmed for fail-safe <br />shutdown?* <br />na <br />Was fail-safe verified to be <br />operational?* <br />na <br />Wait time between applying <br />pressure/vacuum/water and starting <br />30 min. <br />test: <br />Test Start Time: <br />12:1.6 pm/12:34 pm <br />Initial Reading ): <br />3.761711/3.7038" <br />Test End Time: <br />12:31 pm/12:49 pm <br />Final Reading (RO: <br />3.7619"/3.7048" <br />Test Duration: <br />2x1.5 min. <br />Change in Reading (Rg-RI): <br />+0.0010" <br />Pass/Fail Threshold or Criteria: <br />0.002" <br />yes <br />Was sensor removed for testing? <br />Was sensor properly replaced after <br />testing? <br />yes <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />there was epee r <br />test becausse the wire 31a Mcoved after 2nd Wt was started and test hqd tarted. <br />If the testing method does not test the entire sump, specify how much of the sump was tested Methods not testing the <br />entire sump should only be used if the monitoring system provides fail-safe shutdown. (See SWRCB LG -160) <br />'With the submersible pump running, place the sensor in product (discriminating sensors should be placed in water). The time <br />between placing the sensor in product and the turbine shutting down is the response time. This should be done if the secondary <br />containment method used does not test the entire volume of the sump. <br />* This information is not needed if the entire sump is tested. <br />Revision: <br />
The URL can be used to link to this page
Your browser does not support the video tag.