C <br />The following is an itemized list of underground storage tank violations that have not <br />been addressed for QUICK SHOP as of June 29, 2017. <br />Open violations from June 10, 2016 inspection <br />Violation #328 - Failed to comply with temporary closure requirements. <br />The 100 and 110 -octane UST system was found to be illegally abandoned. This violation was fist noted on the <br />Notice to Abate Immediately issued by the EHD on 4-13-2013. A permit to repair the failed 100 -octane spill <br />container was obtained on 3-6-2015, no spill container repairs were conducted at this time. Furthermore, the <br />100 -octane turbine has a disconnected power source. Mr. Chahoud stated that the entire concrete slab over the <br />split 100, 110, and diesel split tank is sinking due heavy vehicular traffic in that area. No person shall abandon an <br />UST system without complying with the requirements of HSC 25298. Mr. Chahoud , tank owner, states the UST <br />system will be reused but he has no funds to repair it at this time. Immediately obtain a permit from the EHD to <br />temporarily close this UST system. <br />This is a repeat violation, Class II. <br />Open violations from March 28, 2016 inspection <br />Violation #318 - Leak detector failed to detect a 3.0 gph leak at 10 psi. <br />The 100 -octane line leak detector failed on 3-22-2016, the 110 -octane line leak detector couldn't be tested on <br />3-22-2016 due to a disconnected power source, and the diesel line leak detector was in slow flow prior to testing <br />and could not be tested at the time of inspection. All line leak detectors shall be capable of detecting a 3 -gallon per <br />hour leak at 10 psi. Immediately have a properly licensed, trained, and certified contractor repair or replace the <br />failed leak detector (LG 113-x listed, if applicable) and obtain a permit within one business day from the EHD. If <br />these failed leak detectors can't be replaced immediately, this UST system will remain red tagged to prevent fuel <br />inputs. Submit proof of correction to the EHD. <br />Violation #325 - Spill container failed to contain a minimum capacity of five gallons. <br />The 100 -octane spill container was not tested, the technician indicated that it failed last time and no repairs were <br />made since the last test, and the diesel direct -bury spill container failed when tested. All spill containers shall have <br />a minimum capacity of five gallons and be capable of containing a spill or overfill until it is detected or cleaned up. <br />Immediately discontinue deposition of petroleum into these tanks until the components are repaired or replaced by a <br />properly licensed, trained, and certified contractor under permit and inspection of the EHD. If these spill containers <br />can't be replaced immediately, this UST system will remain red tagged to prevent fuel inputs. A permit application <br />for the repair of the diesel spill container only was received by the EHD, however, as of today, no spill container <br />functionality verification was conducted. <br />Violation #328 - Failed to comply with temporary closure requirements. <br />The 100 and 110 -octane UST system was found to be illegally abandoned. This violation was fist noted on the <br />Notice to Abate Immediately issued by the EHD on 4-13-2013. A permit to repair the failed 100 -octane spill <br />container was obtained on 3-6-2015, no spill container repairs were conducted at this time. Furthermore, the <br />100 -octane turbine has a disconnected power source. Mr. Chahoud stated that the entire concrete slab over the <br />split 100, 110, and diesel split tank is sinking due heavy vehicular traffic in that area. No person shall abandon an <br />UST system without complying with the requirements of HSC 25298. Mr. Chahoud , tank owner, states the UST <br />system will be reused but he has no funds to repair it at this time. Immediately obtain a permit from the EHD to <br />temporarily close this UST system. A permit application was submitted to the EHD for the temporary closure, <br />however since the permit application was not complete it was not approved at this time, submit all the required <br />information for the above permit application and temporarily close this UST system, as required. <br />Open violations from March 22, 2016 inspection <br />Page 3 of 5 <br />