Laserfiche WebLink
0 0 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 2 of 2) <br /> VL UNDER DISPENSER CONTAINMENT (UDC)MONITORING (Check all <br /> that apply) <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ® 3.ELECTRONIC STAND-ALONE 490-54a. <br /> 4.NO DISPENSERS 490-54b. <br /> ❑ 99.OTHER(Specify) <br /> LEAK MONITOR MANUFACTURER:Veeder Root TLS-350MODEL#:0847090-022 490-55. 490-56. <br /> LEAK SENSOR MANUFACTURER:Veeder Root Stand Alone 490-57. MODEL#(S):001 490-58. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ® b.NO 490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ® b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ® b.NO 490-61. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑ b.NO 490-62. <br /> ......1111.... ...1111.. 1.1..1.1.. .1 111.... .. ........... .........1 111-.. ... ... ..- .. .. ... ....................................1 ..... ... ... ....... ................... <br /> UDC CONSTRUCTION IS: ® 1.SINGLE WALL ❑ 2.DOUBLE WALL 490-63. <br /> IF DOUBLE WALL: 490-64a. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ® b.NO 490-64b. <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.t23 CCR 02644.11 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-68. <br /> ❑ a.ALARM LOGS ® b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ❑ It.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> ® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490.69a. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490.69b. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490.69c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69f. <br /> STATISTICAL INVENTORY RECONCILIATION <br /> ❑ SWRCB PUBLICATION: UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS 490-69g. <br /> ❑ OTHER(Specify): 490-69h. <br /> 490-69i. <br /> ® This facility has a Designated UST Operator who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The Designated UST Operator will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility s best management practices. <br /> ➢ The facility employee s role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> The facility employee s role with regard to spills and overfills as specified in the facility s UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490.71. <br /> Note: Designated Operator inspections occurring monthly and include tripping/alarming monitoring system. In order <br /> to preserve alarm history the Designated Operator will print out alarm history/log prior to completing monthly <br /> inspection and will affix to DUSTO. <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: l.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan occurs;2.)all conditions that indicate a possible release are investigated;and 3.)all mom orin records are maintained pr erI . <br /> g.. ........ .-- ........ .. ......... P.......P y ......... .. <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: KBsi Montgomery 490-72. TITLE:Plant Engineering Supervisor 490-73. <br /> NAME: Jason SChoon 490-74. TITLE:District Environmental Coordinator 490-75, <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: I certify that to4formation ovided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 490-72 <br /> REPRESENTING:I]1.Tank Owner/Operator[3f.F cility O e Operator 0 3.Authorized Representative of Owner 490-76. <br />