Laserfiche WebLink
I:\apps\JOBS\2006\ 1493\SB989.doc <br />t AC TOR, <br />7. SPILL/OVERFILL CONTAINMENT BOXES <br />Page 5 <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />❑ <br />Test Method Developed By: <br />0 Spill Bucket Manufacturer <br />❑ Other (Spec) <br />X Industry Standard <br />❑ Professional Engineer <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Spec) <br />❑ Vacuum <br />X Hydrostatic <br />Test E ui ment Used: Ronan/Caldwell H drostatic Sum Tester <br />Box # 1 Box # <br />Equipment Resolution: 0.0000" <br />Box # Box # Box # Box # <br />rBucketDiameter: <br />— 12" <br />— 18" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />+/- 30 Min <br />Test Start Time: <br />12:00 PM <br />Initial Reading (RI): <br />- <br />Test End Time: <br />12:00 PM <br />Final Reading (RF): <br />- <br />Test Duration: <br />24 hr <br />Change in Reading (RF -RI): <br />NO LOSS <br />Pass/Fail Threshold or <br />Criteria: <br />PASS =No Loss or Loss of 0.0020" or less in 12 minutes <br />Comments — (include information on repairs made prior to testing, and recommended follow-up <br />for failed tests) <br />I:\apps\JOBS\2006\ 1493\SB989.doc <br />