Laserfiche WebLink
El <br />�J <br />10. SITE PLAN Page 6 <br />.................................................... <br />In ELECTRIC (E) FENCED ENCLOSURE <br />Comments — (Show location of piping run and related failures) <br />I:\apps\JOBS\2006\1493\SB989.doc <br />FUEL PIPING 6 <br />TANK MONITOR PANEL <br />TRANS" BOX <br />SEE SHEET 4 <br />~`` <br />(E) GUARD POSTS. REPLACE <br />NECESSARY DURING <br />REMOVE (E) VENT <br />--- —GRAVEL <br />R ^ <br />1 <br />CONSTRUCTION .' <br />RISER & PIPINO <br />�. <br />TYP. OF 3 <br />' <br />VENT RISER AND <br />TRANSIT�N Box 3 <br />NOTE <br />SLOPE ALL UNDERGROUND <br />FUEL AND VENT PIPING <br />1/4" TO TANK SUMP <br />s <br />DOU8LE WALL UNDERGROUND VENT LINE <br />REMOVE (E) UNDERPMNO <br />FUEL LINES AND INSTALL <br />( r , <br />(18ER <br />E() 35D GALLON DOUBLE WALL <br />NEIN DOUBLE WALL FUEL <br />GLASS UNDERGROUND <br />UNES <br />DIESEL TANK <br />{REPLACE ALL ASSOCIATED FUEL. <br />OVERFILL ALARM <br />SEE SHEET 4 <br />ti <br />Ami VENT PIPING AND TANK SUMP) <br />Comments — (Show location of piping run and related failures) <br />I:\apps\JOBS\2006\1493\SB989.doc <br />FUEL PIPING 6 <br />TANK MONITOR PANEL <br />TRANS" BOX <br />SEE SHEET 4 <br />AT BULDING 3 <br />CONNECT NEW FUEL PIPING <br />TO (E)FUEL PIPING <br />E) 01 NERATOT <br />INSIDE BUILDING <br />T <br />t <br />} <br />Comments — (Show location of piping run and related failures) <br />I:\apps\JOBS\2006\1493\SB989.doc <br />