Laserfiche WebLink
M <br /> SWRCB,January 2002 0 • Page 3 of 5 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: I] Industry Standard Test Method Used: 0 Pressure <br /> Test Equipment Used: Pressure Gage 0- 15 psig Equipment Resolution: +/- 0.5 psig <br /> Supply Piping Return Piping Vent Piping <br /> Run Run Run <br /> Piping Material: Polyethylene Polyethylene Polyethylene <br /> Piping Manufacturer: Environ Environ Environ <br /> Piping Diameter: 3/4" 1" 1 1/2" <br /> Pipe Run Length: 45 feet 45 feet 6 feet <br /> Product Stored: Red Dye Diesel Red Dye Diesel Red Dye Diesel <br /> Method/location of pipe-run Test boot in sump Test boot in sump Test boot in sump <br /> isolation: <br /> Wait to start Test: 15 minutes 15 minutes 15 minutes <br /> Test Start Time: 10:00 AM 10:00 AM 10:00 AM <br /> Initial Reading (RI): 5 psig 5 psig 5 psig <br /> Test End Time: 11:00 AM 11:00 AM 11:00 AM <br /> Final Reading (RF): 5 psig 5 psig 5 psig <br /> Test Duration: 1 hour 1 hour 1 hour <br /> Change (RF-RI): 0 psig 0 psig 0 psig <br /> Pass/Fail Criteria: +/- 0 psig +/- 0 psig +/- 0 psig <br /> Test Result: ElPass ❑Fail [EPass [Hail OPass ❑Fail <br /> Comments — (include information on repairs made prior to testing, and recommended follow-up for failed <br /> tests) <br />