Laserfiche WebLink
SWRCB, January 2002 Page' of <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />X Pressure <br />❑ Other (Spec) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />EME011M Piping Run #1 <br />Piping Run #2 <br />Equipment Resolution: 1/10-15 Psi <br />Piping Run #3 Piping Run #4 <br />Piping Material: <br />Poly Plastic <br />Poly Plastic <br />Poly Plastic <br />Poly Plastic <br />Piping Manufacturer: <br />Environ <br />Environ <br />Environ <br />Environ <br />Piping Diameter: <br />F, <br />1" <br />F, <br />F, <br />Length of Piping Run: <br />12' <br />12' <br />12' <br />46' <br />Product Stored: <br />Dyed Diesel <br />Dyed Diesel <br />Dyed Diesel <br />Dyed Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at Piping <br />Sump <br />Test boot at Piping <br />Sump <br />Test boot at Piping <br />Sump <br />Test boot at Piping <br />Sum <br />Wait time between applying <br />pressure and starting test: <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />Test Start Time: <br />8:55 <br />9:00 <br />9:05 <br />9:10 <br />Initial Reading (Rj): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test End Time: <br />9:55 <br />10:00 <br />10:05 <br />10:10 <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: <br />I Hour <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF-Rj): <br />0 Psi <br />0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Test Result: Pass Pass Pass Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />