My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
1420
>
2300 - Underground Storage Tank Program
>
PR0231736
>
COMPLIANCE INFO_2006-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 12:42:29 PM
Creation date
6/23/2020 6:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2018
RECORD_ID
PR0231736
PE
2361
FACILITY_ID
FA0002562
FACILITY_NAME
Sutter Valley Hospitals dba Sutter Tracy Community Hospital
STREET_NUMBER
1420
Direction
N
STREET_NAME
TRACY
STREET_TYPE
Blvd
City
Tracy
Zip
95376
APN
233-081-01
CURRENT_STATUS
01
SITE_LOCATION
1420 N Tracy Blvd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231736_1420 N TRACY_2006-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
485
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Page of <br />f <br />6. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />X Piping Manufacturer El Industry Standard 11 ProfessibnaLEngineer. <br />Li Other (Specify) <br />Test Method Used: <br />X Pressure 11 Vacuum 11 Hydrostatic <br />Li Other (Specify) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br />MENEM- <br />Piping Run #5 Piping Run # Piping Run # Piping Run # <br />Piping Material: <br />Poly -Co Flex Plastic <br />-Piping Manufacturer: <br />Western Fiberglass <br />Piping Diameter: <br />119 <br />Length of Piping Run: <br />479 <br />Product Stored: <br />Dyed Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at Piping <br />Sump <br />Wait time between applying <br />pressure and starting test: <br />10 Minutes <br />Test Start Time: <br />8:50 <br />Initial Reading (Rj): <br />5 Psi <br />Test End Time: <br />9:50 <br />Final Reading (RF): <br />5 Psi <br />Test Duration: <br />I Hour <br />Change in Reading (RF -R,): <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />Test Result. Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.