My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:30:52 PM
Creation date
6/23/2020 6:51:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004-2009
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\V\VICTOR\880\PR0231746\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to My of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />SWRCB, January 2002 <br />Page of <br />6. PIPING SUMP TESTING <br />Test Method Developed By: <br />❑ Sump Manufacturer Industry Standard <br />❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />O Pressure <br />O Vacuum <br />Iydrostatic <br />0 Other (Spec) <br />Test Equipment Used:- <br />Equipment Resolution: <br />Sump # / <br />Sump # <br />Sump # <br />Sump # <br />Sump Diameter: <br />s <br />Sump Depth: <br />55— <br />i r <br />Sump Material: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />O Yes NA <br />O Yes ❑ No 0 NA <br />O Y o DNA <br />O Yes ❑ No O NA <br />product and water)?° <br />Turbine shutdown response time <br />: Is system programmed for fail-safe <br />:shutdown?* <br />❑yes ❑ No ❑ NA <br />es ❑ No ❑ <br />O Yes ❑ No <br />0 NA <br />❑ Yes ❑ No 0 NA <br />Was fail-safe verified to be <br />operational?* <br />❑ No 0 NA <br />0 Yes 0 No 1)NA <br />0 Yes 0 <br />A <br />0 Yes 0 No 0 NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />.Test Start Time: <br />initial Reading (Pj): <br />74111 <br />Test End Time: <br />10 <br />1 <br />Final Reading (RF): �7ot- <br />Test Duration: <br />Change in Reading (RF-Rj): <br />Pass/Fail Threshold or Criteria: <br />r <br />Was sensor removed for testing? <br />O Yes O No 0 NA <br />O Yes 0 No 0 NA <br />❑ Yes O No <br />O NA <br />0 Yes ❑ No 0 NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />0 yes 0 No O NA <br />0 Yes 0 No 0 NA <br />0 Yes ❑ No <br />❑ NA <br />❑ Yes ❑ No O NA <br />_Comments — (include information on repairs made prior to testing, and recommended follow-up <br />for failed tests) <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to My of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.