My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:40:14 PM
Creation date
6/23/2020 6:51:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231746_880 E VICTOR_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. SECONDARY PIPE TESTING RECEIVED <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Profess' <br />IF1 Other (Spec) <br />Test Method Used: ® Pressure ❑ vacuum ❑ Hy i$NME TAL HEALTH <br />❑ Other (Spec) PERMIT/SERVICES <br />Test Equipment Used: PRESSURE GAUGE Equipment Resolution: <br />Run # 87 Piping Run # 91 Piping Run # DSL Piping Run # <br />Piping Manufacturer: <br />UNKNOWN <br />UNKNOWN <br />UNKNOWN <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />300 FT <br />300 FT <br />50 FT <br />Product Stored: <br />87 <br />91 <br />DSL <br />Method and location of <br />piping -run isolation: <br />ISO BOOT <br />ISO BOOT <br />ISO BOOT <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 MIN <br />15 MIN <br />15 MIN <br />Test Start Time: <br />10:15 <br />10:15 <br />11:45 <br />Initial Reading (Ri): <br />5 PSI <br />5 PSI <br />5 PSI <br />Test End Time: <br />11:15 <br />11:15 <br />11:45 <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />5 PSI <br />Test Duration: <br />I HR <br />1 HR <br />1 HR <br />Change in Reading (RF -RI): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 <br />0 <br />Test Result: <br />®Pass ❑Fail <br />Pass . ❑Fail. <br />®Pass ❑Fail , ❑ :Pass ❑Fail <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />Secondary Containment Test Results 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.