Laserfiche WebLink
SWRCB, January 2002 Page _ of <br />10. SPILL/OVERFILL CONTAINMENT BOXES <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />N, <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />Final Reading (RF): <br />TestDuration: <br />vgsptj,-C�Kl <br />IEN-IFAL HEALTH <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />