My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:54:13 PM
Creation date
6/23/2020 6:52:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231784_6633 PACIFIC_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
604
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c <br /> SA N sJ O A Q U I N Environmental Health Department <br /> COUNTY <br /> i. Verification of capped vapor pipe. <br /> j. Provide disposal records for any rinsate (if applicable). <br /> k. Sensor functionality: Functionality of the monitoring system must be verified to ensure that <br /> monitoring has been restored to meet the requirements of Title 23 California Code of <br /> Regulations and the Health & Safety Code. A copy of the alarm history shall be printed <br /> prior to performing the "cold start" of the Veeder Root system and made available at the <br /> time of EHD inspection. <br /> I. Leak detector test: Leak detector must be tested to confirm that the device can detect a <br /> leak of 3 gallons per hour at 10 psi. <br /> Please be aware that the facility cannot operate the UST system or receive fuel in the <br /> diesel tank prior to the EHD inspection and approval. <br /> 4. Secondary containment testing for the affected, and installed components is required six <br /> months after installation. Provide 48 hours notification to the EHD when this test is scheduled. <br /> 5. Any individual performing the work of a service technician must meet the following <br /> qualifications: <br /> a. Possess or be employed by a person who possesses one of several permissible valid, <br /> current contractor's licenses issued by the Contractors State License Board (may be issued <br /> to the installation company), or a Tank Tester's license issued to the individual by the State <br /> Water Board, and <br /> b. Possess or work under the direct and personal supervision of an individual physically <br /> present at the work site who possesses a valid, current California UST Service Technician <br /> certificate issued by the International Code Council (ICC), and <br /> c. Possesses a valid, current certificate of training from the manufacturer(s) of the <br /> component(s) being tested, repaired, or serviced. <br /> 6. Individuals installing underground storage tank system components must possess or work <br /> under the direct and personal supervision of an individual physically present at the work site <br /> who possesses all of the following: <br /> a. A valid, current contractor's license issued by the Contractors State License Board, and <br /> b. A valid, current UST Installation/Retrofitting certificate issued by the International Code <br /> Council (ICC), and <br /> c. A valid, current certificate of training from the manufacturer(s) of the component(s) being <br /> installed. <br /> 7. Log into the California Environmental Reporting System (CERS), update and submit the "UST <br /> Monitoring Plan" for tank three for approval. <br /> 8. Log into the California Environmental Reporting System (CERS), complete and submit a "UST <br /> Certification of Installation/Modification" form for the UST within 30 days. <br /> 9. All components must be certified by an independent testing organization and labeled as <br /> required by the organization (UL, ULC, ANSI, API, ASTM, etc.). See California Code of <br /> Regulations (CCR) Title 23, Chapter 16, Table B for a complete list. <br /> 10. All primary containment including any integral secondary containment system must be certified <br /> by an independent testing organization and labeled as required by the organization (Title 23 <br /> Chapter 16, 2631(b); (UL, ULC, ANSI, API, ASTM, etc. See Title 23 Chapter 16 Table B for <br /> complete list.) Pursuant to Underwriters Laboratories Inc (UL) listing requirements, only those <br /> products bearing the UL mark will be considered listed. ANY PART/PRODUCT NOT <br /> 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.