My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
907
>
2300 - Underground Storage Tank Program
>
PR0231871
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:56:31 PM
Creation date
6/23/2020 6:53:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0231871
PE
2361
FACILITY_ID
FA0003968
FACILITY_NAME
AT&T California - UE046
STREET_NUMBER
907
Direction
W
STREET_NAME
LINCOLN
STREET_TYPE
Rd
City
Stockton
Zip
95207
APN
077-470-07
CURRENT_STATUS
01
SITE_LOCATION
907 W Lincoln Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231871_907 W LINCOLN_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />v <br />Page 4of5 <br />Test Method Developed by <br />❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used <br />❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Incon TS -STS <br />Equipment Resolution: .0006 <br />Sump # Piping <br />U E046U002 <br />Sump # <br />Sump # <br />Sump # <br />Sump Diameter <br />44" <br />Sump Depth <br />56" <br />Sump Material <br />Poly <br />Height from Tank Top to Top of <br />Hi est Piping Penetration <br />20" <br />1 lei ght from Tank Top to Lowest <br />Electrical Penetration <br />15" <br />Condition of w <br />41p prior to testing <br />Good <br />Portion of Sump Tested (1) <br />2" above high pen <br />Does turbine shut down when <br />"! Mlp sensor detects liquid (both <br />roduct and water)?* <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No [INA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />NA <br />Is sytem programmed for fail-safe <br />shutdown?* <br />❑ Yes ❑ No 0 NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />❑ Yes ❑ No ® NA <br />D Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test <br />30 min <br />Test Start Time <br />11:29 am 11:46 am <br />Initial Reading Ri <br />4.0436 4.0438 <br />Test End Time <br />11:44 am 12:01 pm <br />Final Reading R <br />4.0438 4.0440 <br />Test Duration <br />15 min 15 min <br />Chane in Reading Rf-Ri <br />.0002 .0002 <br />Pass/Fail Threshold or Criteria <br />.002 <br />Test Result <br />® Pass ❑ Fail <br />❑ Pass ❑ Fall <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />® Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testin 7 <br />© Yes ® No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Comments include any information on repairs made prior to testing, and recommended follow -u for failed tests <br />Sensor reinstalled to lowest point but not tested. <br />(1) if the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.